Skip to main content

SPE Logo 

SPE WORKSHOP
Wells Integrity, Intervention and Workover Solutions

8–9 October 2024 | Kota Kinabalu, Sabah, Malaysia

SPE Logo

SPE WORKSHOP
Wells Integrity, Intervention and Workover Solutions

8–9 October 2024 | Kota Kinabalu, Sabah, Malaysia

Technical Schedule

Subpage Hero

Loading

Session 7: Poster Session / Coffee and Tea Break

Wednesday, 9 October

Session Managers: Lilihani Maluan, PETRONAS Carigali Sdn Bhd; Rayner Brian Fidelis Sipangkui, PETRONAS Carigali Sdn. Bhd.

Poster Presenters:

  • Case Study of Casing Patch Technology for Zone Isolation and Integrity Repair at South of Oman by Issa Ali Al Hadhrami, Senior production technologist Petroleum Development Oman
  • Fluid Sampling And Ion Analysis: Faster, Cheaper, And Unitless Well Subsurface Integrity Test by Khalifa Al Hinaai, Well Integrity Engineer, Petroleum Development Oman
  • Advancing Well Integrity: PETRONAS' First Application of Time-Activated Sealant Technology for Control Line by Puvethra Nair, Well Engineer, PETRONAS Carigali Sdn. Bhd.
  • Well Integrity Redefined: Centralized Digital Management Solutions by Muhammad Imran Ratasha, Subject Matter Expert - PE Data Analyst, AEM Energy Solutions Sdn. Bhd.
  • Deployment of Modified Cement Retainer to Address Multiple Leaks in Production Tubing for Cement Packer Operation by Muhammad Shahfariz B Mohamed Salim, Field Engineer, Neu Dimension Bid (M) Sdn Bhd 
  • Idle Well Reactivation 38mil Cash generation Made Possible Via Debris Cleanout and Reperforation Following Successful Belzona Putty Application to Address Christmas Tree Leak Issue by M Shamsuri Mahussin Senior Well Intervention Executive, PETRONAS Carigali Sdn. Bhd.
  • Preserving Hydrocarbon Production & Well Integrity for the Future – Lessons Learnt from Workover of High Temperature Well by Muhamad Syazwan Farouq Mohd Fazla, Executive Wells Workover & CTD, PETRONAS Carigali Sdn. Bhd.
  • Workover Fishing: Retrieval of Stucked Coiled Tubing in Deep and High Angle Well in Mature Field by Muhamad Salman Mohd Sati, Workover Engineer, PETRONAS Carigali Sdn. Bhd.
  • Evaluating Well Integrity: Acoustic Logging Ensuring Successful Behind Casing Opportunity Cement Packer and Add Perforation Operations by Farid Toha, Customer Sales Rep, Archerwell
  • Enhancing CCUS Project Integrity Through Measuring Monitoring & Verification Technologies by Samini Muruthy, Geoscientist, Halliburton
  • Thru-Tubing Plug and Abandoment System by Low Yitseng, Global Product Line Champion, Weatherford
  • Evolution of Realtime Coiled Tubing in Malaysia by Mustafa Hakimuddin, Project Manager, SLB
  • A Sustainable Approach to Resolving Well Integrity Issues: A Success Story by Farhan Nore, Well Services Group (Thru Tubing), Weatherford Technology & Training Center

Sign up for the newsletter