Skip to main content

SPE Logo 

SPE WORKSHOP
Well, Reservoir and Facilities Management (WRFM)
- Unlocking Value through Innovation, Integration and Sustainability 

16–17 June 2025 | Bandar Seri Begawan, Brunei

SPE Logo

SPE WORKSHOP
Well, Reservoir and Facilities Management (WRFM)
- Unlocking Value through Innovation, Integration and Sustainability 

16–17 June 2025 | Bandar Seri Begawan, Brunei

Technical Session

Subpage Hero

Loading

Session 3: Artificial Lift

16 Jun 2025
Indera Kayangan Ballroom, Level 4, Main Atrium Building
Technical Session

Session Managers: Jason Kok, Innovateq; Charles Bonaventure, Weatherford, Ismael Betancourt, Weatherford

Enhancing production and ensuring well integrity requires the implementation of innovative gas lift solutions and other artificial lift methods that address the specific challenges of existing assets. As easily accessible reserves become scarce, operators and service companies are focusing on optimizing mature fields by leveraging advanced technologies to boost production and maintain well integrity. This workshop will delve into state-of-the-art gas lift technologies and techniques designed to manage fluctuating reservoir pressures, aging infrastructure, and common integrity issues such as corrosion and mechanical failures. By incorporating real-time monitoring, remote control, predictive maintenance, and data-driven decision-making, these advancements enhance operational resilience and efficiency.

The discussion will share experiences in overcoming challenges, best practices, and lessons learned to achieve higher success rates in optimizing gas lift operations and ensuring well integrity, ultimately contributing to the resilience and efficiency of existing assets.


Discussion Leaders:

  • Reviving Mature Gas Wells: A Strategic Approach to Tackle Deliquification and Deferred Production Recovery by Nigel Brian Chin Chee Wui, Brunei Shell Petroleum
  • Retrofit Thru Tubing Deep Gas-Lift System Successfully Enhances Hydrocarbon Production by More Than 200% in Offshore East Java by Ismael Betancourt, Weatherford
  • Foam-Assisted Gas Lift Optimization: A Cost-Effective Production Enhancement Solution for Mature Offshore Fields by Md Najib Latif and Tommy Yong Teck Fook, Brunei Shell Petroleum
  • The Evolution of the ESP Completion Design in Field X: A Journey of Continuous Improvements by Fadzlan Suhaimin and Yazid Yasmin, Brunei Shell Petroleum