Restoring Integrity and Maximizing Late-Life Well Value

Wednesday, 24 March
Waterway 4
Technical Session
Extending the productive life of aging wells while maintaining robust barrier management is critical to maximizing asset recovery. This session presents global case studies and novel remediation strategies designed to address well integrity challenges and restore lost production. Presentations will highlight advanced diagnostics, workover innovations, and downhole intervention techniques that minimize non-productive time and mitigate barrier failures. Attendees will gain insights into modern methodologies that balance operational risk with cost-effective late-life enhancement.
Session Chairpersons
Diego Robles - Adam Oaks Energy
Phuc Truong - Perenco
  • 1345-1700 237309
    Cleanouts Poor Cousin, Give Reverse Cleanouts A Chance!
    S. Craig, Baker Hughes Company; D. Wood, Baker Hughes; D. Kellock, Baker Hughes Company
  • 1345-1700 237325
    Speed Without Compromise: Deploying High-resolution Acoustics For Programmatic Field Wide Casing Integrity Assessments To Reduce Costs And Optimize Completion Rig Utilization
    T. Pehlke, A. Lubchansky, DarkVision Technologies Inc; T. Maxwell, Darkvision Technologies; Z. Evans, DarkVision Technologies Inc
  • 1345-1700 237320
    Continuous Wax Surveillance Using Distributed Temperature Sensing With Well Intervention Validation
    R. Javadzade, A.R. Laheja, R. Ramazanov, F. Atakishiyev, BP; S. Dutta, A. Kumar, A. Demyanov, F. Jabrail-Zada, SLB
  • 1345-1700 237296
    Restoring Well Productivity Through Multifunctional Chemistry: A Field-proven Approach To Solid Buildup Remediation And Prevention
    R. Morales, Revive Energy Corp; C. Tocora, Revive Energy Solutions
  • 1345-1700 237281
    Breaking The Sustainable Casing-Casing Annulus Pressure Engineering Dilemma: An Innovative Engineering Roadmap To Resolve SAP B Using Comparative Field Deployment Of Mitigation And Remediation Technologies
    A. Aly, M. Mohamed Al Hammadi, ADNOC Onshore
  • 1345-1700 237304
    Annular Cement Placement For Zonal Isolation Using CT Cement Packers: Design, Execution, And Lessons Learned
    H. Arstianti, A. Terry, A. Cahyono, R. Wijaya, W. Gunawan, Baker Hughes
  • 1345-1700 237333
    Unlocking Stranded Production Through Rigless Zonal Transfer: Integrating Instrumented Coiled Tubing And Chemical Isolation To Reactivate An Idle Observation Well In South-East Kuwait — A Landmark Case Study
    R. Sunagatov, M. Slama, K. Badrawy, SLB
  • 1345-1700 237316
    Cost-Effective Production Recovery: Unlocking Shut-In Dual-String Reserves Beyond Short Strings Using Existing, Non-Exotic Coiled Tubing Equipment
    M.I. Abd Jalil, Petronas Carigali Sdn Bhd; Y. Kung, Dimension Bid (M) Sdn Bhd
  • 1345-1700 237289
    Innovative Technology Development And First Deployment Of Insert Safety Valves In Brazil's Deepwater Pre-salt: Enabling Safe And Cost-effective Reactivation Of Idle Wells With Integrity Issues
    W. Gama, R. Pereira, F.S. Oliveira, PETROBRAS
  • 1345-1700 237280
    Dynamic Multiphase Flow Implementation In Coiled Tubing Gas Lifting Applications
    M. Khabbazi, Perenco; P. Truong, Perenco Holdings Ltd