Skip to main content
Loading

Optimizing CT Operations: Cost Efficiency and Cycle-Time Reduction

Tuesday, 23 March
Waterway 1-3
Technical Session
This session will explore practical strategies to improve cost leadership and reduce cycle time in coiled tubing operations while maintaining safety, reliability, and operational performance. The discussion will focus on how better planning, technology, equipment utilization, logistics, operational efficiency, and collaboration across operators and service companies can reduce non-productive time and improve overall well-intervention economics. Industry leaders will share experiences, challenges, and best practices for delivering more efficient CT operations and creating sustainable value throughout the intervention lifecycle.
Session Chairpersons
Roberto Paez - Tenaris
Azwan Keong - SLB
  • 1500-1615 237311
    Flowline Remediation Through Industry-first Open-water Intervention System Operability Analysis And Implementation
    L.M. Ge, C. Kress, BP America Production Co.; M. Vick, bp; A. Khalily, BP America Inc
  • 1500-1615 237299
    Building An Analytics-ready Operating Model For Well Interventions Through Workflow Standardization And Data Governance
    M.W. Soerensen, Aker BP ASA
  • 1500-1615 237290
    What Is A Successful Coiled Tubing Intervention? An Evolving Answer Reviewed Through The Lense And Transformation Of Design, Acquisition, And Archival Systems
    S. Hassig, S. Rondon Fajardo, P. Ramondenc, SLB
  • 1500-1615 237326
    Optimizing The Longevity Of The Annular Fracturing Coiled Tubing Strings Through Analysis Of The Main Drivers Of Sand Erosion
    J. Yeung, B. Nowell, J. Baker, Element Technical Services; K. Elliott, Quality Tubing
  • 1500-1615 237344
    A Hybrid BHA Enabled Milling Of Permanent Bridge And Matrix Stimulation With Inline Fluidic Oscillator
    M. Raza, Halliburton Saudi Arabia