Optimizing CT Operations: Cost Efficiency and Cycle-Time Reduction
Tuesday, 23 March
Waterway 1-3
Technical Session
This session will explore practical strategies to improve cost leadership and reduce cycle time in coiled tubing operations while maintaining safety, reliability, and operational performance. The discussion will focus on how better planning, technology, equipment utilization, logistics, operational efficiency, and collaboration across operators and service companies can reduce non-productive time and improve overall well-intervention economics. Industry leaders will share experiences, challenges, and best practices for delivering more efficient CT operations and creating sustainable value throughout the intervention lifecycle.
-
1500-1615 237311Flowline Remediation Through Industry-first Open-water Intervention System Operability Analysis And Implementation
-
1500-1615 237299Building An Analytics-ready Operating Model For Well Interventions Through Workflow Standardization And Data Governance
-
1500-1615 237290What Is A Successful Coiled Tubing Intervention? An Evolving Answer Reviewed Through The Lense And Transformation Of Design, Acquisition, And Archival Systems
-
1500-1615 237326Optimizing The Longevity Of The Annular Fracturing Coiled Tubing Strings Through Analysis Of The Main Drivers Of Sand Erosion
-
1500-1615 237344A Hybrid BHA Enabled Milling Of Permanent Bridge And Matrix Stimulation With Inline Fluidic Oscillator



