Skip to main content
Loading

Horizontal and Multilateral Well Solutions

Tuesday, 23 March
Waterway 1-3
Technical Session
Today’s well intervention challenges demand continued innovation to access and operate effectively in increasingly complex horizontal and multilateral wells. This session will examine emerging practices and advances in coiled tubing string design and well intervention methodologies developed to address these demanding conditions. Presenters will discuss current operational challenges, practical applications of new technologies, and the role of innovation in extending performance limits in complex well architectures. The session will also highlight how these developments are shaping the evolving intervention playbook.
Session Chairpersons
Jackie Lewis - ConocoPhillips
Rodrigo Aviles Miranda - Little Red Services
  • 0800-1115 237345
    Evolution Of Quenched And Tempered Coiled Tubing: Variable-grade String Designs For Improved Reliability And Dependable Running Life
    C. Grimaldo, M. Pelcastre, Tenaris; J. Skufca, Nine Energy Service; E. Padilla Benitez, Tenaris Coiled Tubes
  • 0800-1115 237285
    Evolution Of Coiled Tubing Multilateral Access: From Bullheading To Electrical Multilateral Tools And The Path To Fully Automated Lateral Entry
    S. Rondon Fajardo, SLB - WIS
  • 0800-1115 237321
    Extending Coiled-tubing Lateral Reach With Dual Hydraulic Oscillators: Mechanistic Modeling And Experimental Validation
    H. Guo, J. Sun, B. Wang, China Natl. Petroleum Corp.
  • 0800-1115 237323
    Remediation Of Unset Open-hole Swell Packers In Horizontal Wells Using A Coiled Tubing Multiset Straddle Packer
    H. Azhar, SLB; Z. Karassay, I. Issayeva, T. Zhumagaziyev, Tengizchevroil LLP (Chevron)
  • 0800-1115 237315
    Advancing Reservoir Performance With 2.875'' Coiled Tubing In Horizontal Open Hole Well Intervention
    Z. Zhang, Baker Hughes Co. Saudi Arabia
  • 0800-1115 237331
    Rewriting The Intervention Playbook For Complex Barefoot Level-1 Multilaterals: An Industry-first Real-time Hybrid Fiber-optic Coiled Tubing Diagnosis And Openhole Straddle Water Shutoff In A Three-leg Mauddud Carbonate Producer To Restore Production And Extend Well Life In North Kuwait
    M. Slama, K. Badrawy, R. Sunagatov, SLB
  • 0800-1115 237339
    Autonomous Electric Well Intervention: Field Validation In Four Multilateral Wells
    C. Ejim, A. Saeed, Saudi Aramco PE&D; B. Bouldin, Wireless INstrumentation Systems AS; S. ALSARAKBI, National Petroleum Services Co Saudi Arabia
  • 0800-1115 237327
    Assured Interventions With Combined Instrumented Electric Line ICD Shifting And Production Logging
    J. Woods, SLB; M.M. Ahmed, I. Stevenson, SLB N.V.; Z. Zaouali, Schlumberger Saudi Arabia; H. Sharma, Saudi Aramco; Y. Aldayel, SLB Middle East; T. Osmond, SLB N.V.
  • 0800-1115 237318
    Six Years Of HLEGS Evolution For Multilateral Access And Extended-reach Stimulation
    Z. Zhang, Baker Hughes Co. Saudi Arabia
  • 0800-1115 237334
    Real-time Hybrid Coiled Tubing: A One-stop Solution For Integrated Well Interventions
    H. Al-obaid, S. Ashby, K. Yilmaz, Saudi Aramco; M. Raza, Halliburton Saudi Arabia