Skip to main content
Loading

Well Abandonment, Decommissioning, and Thru-Tubing Recompletion II

Wednesday, 25 March
Waterway 2-3
Technical Session
This session covers unconventional gas well interventions prior to fracturing, focusing on coiled tubing-based abrasive perforating in long laterals. The approach addresses injectivity challenges when the TIV is inactive due to cement or debris, using a single-run solution to drift the wellbore and perform perforations, ensuring readiness for plug-and-perf operations.
Session Chairpersons
Renny Ottolina - ADNOC Onshore
Mohammed Abu Jarour - National Energy Services Reunited
  • 1500-1525 231336
    Assuring Critical Coiled Tubing Re-entry Operations Of Old Wells With Integrity Issues By The Application Of The Well Intervention Guide, Provides Execution To Safeguard The Life And Environment
    A. Rodriguez, R. Garay, C. Cadavid, Ecopetrol
  • 1525-1550 231339
    Retrieval Of A Lightweight Fish Using Imaging And Downhole Telemetry
    H. Alnasser, Baker Hughes Co. Saudi Arabia; P. Correa, Baker Hughes
  • 1550-1615 231319
    Poromechanical Method To Tailor Cement Plugs For Long Term Integrity
    S. Jandhyala, W. Cuello Jimenez, Halliburton; A. Kumar, Petronas
  • 1615-1640 231357
    Assessment Of Progress, Costs, And Benefits Of The Federal IIJA Orphan Well Program
    C. Muir, CJM Petroleum Consulting
  • Alternate 231393
    Unlocking Advanced Coiled-Tubing Workflows With Rugged Electrically Actuated Downhole Tools
    M. Hofacker, A. Keong, SLB; F. Jahn, Schlumberger Norge AS