Well Abandonment, Decommissioning, and Thru-Tubing Recompletion II
Wednesday, 25 March
Waterway 2-3
Technical Session
This session covers unconventional gas well interventions prior to fracturing, focusing on coiled tubing-based abrasive perforating in long laterals. The approach addresses injectivity challenges when the TIV is inactive due to cement or debris, using a single-run solution to drift the wellbore and perform perforations, ensuring readiness for plug-and-perf operations.
Session Chairpersons
-
1500-1525 231312Advance Technique of Cutting and Recovering Stuck Drill String to Re-Establish Wellbore Accessibility With Utilization of E-Line Coiled Tubing: A Case Study
-
1525-1550 231339Retrieval of a Lightweight Fish Using Imaging and Downhole Telemetry
-
1550-1615 231393Unlocking Advanced Coiled-Tubing Workflows With Rugged Electrically Actuated Downhole Tools
-
1615-1640 231357Assessment of Progress, Costs, and Benefits of the Federal IIJA Orphan Well Program