Well Abandonment, Decommissioning, and Thru-Tubing Recompletion I
Wednesday, 25 March
Waterway 2-3
Technical Session
This session showcases innovative well abandonment and thru-tubing recompletion methods that overcome severe integrity challenges while reducing rig time, cost, and environmental footprint. Presentations cover onshore and offshore case studies demonstrating how coiled tubing, rigless interventions, and advanced thru-tubing systems deliver safe, permanent, and regulatory-compliant solutions.
-
1015-1040 231326Recovering From Integrity Loss In Compromised Completion With Coiled Tubing Abandonment Techniques
-
1040-1105 231316Rigless Permanent Abandonment Of A Water Supply Well In A Middle Eastern Oil Field: Overcoming Integrity Failures And Cementing Challenges Through Solvent-based Cleanout And Adaptive Fluid Management
-
1105-1130 231377Batch Operations With Partially Riserless Access In Offshore Western Africa Reduce Operational Times For Plug And Abandonments Using Coiled Tubing
-
1130-1155 231350Advanced Thru-tubing System Delivers Permanent Well Abandonment Via Multi-annular Cementing
-
Alternate 231329Optimized Debris Cleanout Procedures For Highly Depleted Horizontal Wells Utilizing Various Techniques Deployed By Coiled Tubing With Specialized Jetting Nozzle And Pumping Synergically Customized Fluids For Debris Dissolution, Loss Control And Hydraulically-engineered Foamed Gel
-
Alternate 231312Advance Technique Of Cutting And Recovering Stuck Drill String To Re-establish Wellbore Accessibility With Utilization Of E-line Coiled Tubing, A Case Study
