Skip to main content
Loading

Production Enhancement and Stimulation

Tuesday, 24 March
Waterway 2-3
Technical Session
Over the next five years, mature assets are expected to make up nearly 80% of global production. Our industry relies on well intervention and stimulation to counteract the rapid decline of brownfields and to extend their producing life. This session delves into innovative tools, products, and techniques that offer significant improvements to support efforts aimed at enhancing production and recovery.
Session Chairpersons
Pierre Ramondenc - SLB
Rodrigo Aviles Miranda - Little Red Services
  • 0800-0825 231328
    Bold Approach Of Conducting Production Enhancement In Gravel Packed Well Resulting In Multifold Production Increase: Case Study From Brown Field In Malaysia
    N. Mazurenko, PETRONAS Carigali; S. Anand, PETRONAS (Kuala Lumpur)
  • 0825-0850 231343
    Electro-hydraulic Pulsing Used To Clear Barium Sulfate Scale And Improve Production On A Multi-well Campaign
    K. Kamaraj, Equinor ASA; C. McKenzie, Blue Spark Energy Inc; D. Cubas, Equinor ASA
  • 0850-0915 231382
    Execution Of A Deployment Strategy For Chalk Consolidation Treatments In An Offshore Environment
    D. Tomczak, A. Hoq, Aker BP; M. Rylance, THREE60 Energy Group; T. Martin, THREE60 Energy Norway AS; A. Gabdullin, SLB; N. Wood, Fracture Technologies Ltd
  • 0915-0940 231315
    Integrated Acid Stimulation Technologies For Recovery Optimization In UAE Brownfields
    A. Nadeem, ADNOC Onshore; M. Subaihi, M. Al Bloushi, M.J. Alblooshi, ADNOC; B. Ahmad, ADNOC Onshore; M. Varshney, A. Adnan, ADNOC
  • 1010-1035 231334
    Restoring Injectivity In Tight Formations: Comparative Evaluation Of Perforation Techniques
    M. Alaithan, A. Alabdulmuhsin, Saudi Aramco SAOO; R. Mustansar, Halliburton; A. Lopez, Halliburton Saudi Arabia
  • 1035-1100 231308
    Experimental Study On Nano Enhanced Urea-formaldehyde Resin For Chemical Sand Consolidation Under Reservoir Conditions
    A.S. Gupta, Rajiv Gandhi Institute of Petroleum Technology
  • 1100-1125 231307
    Beyond Acid: Energized Single-phase Retarded Stimulation With Degradable Particulate Diverter Enhances Productivity In North Kuwait Jurassic Gas Reservoirs
    M. Elsebaee, A. Salem, SLB
  • Alternate 231331
    Advancing Formation Potential: Coiled Tubing Telemetry Tool With Extended Reach Intervention For Complex Horizontal Wells Acid Stimulation
    Z. Zhang, Baker Hughes Co. Saudi Arabia; C. De La Cadena, Baker Hughes; H.E. Mahmoud, Baker Hughes Co. Saudi Arabia; P.D. Correa, Baker Hughes
  • Alternate 231353
    Customized Mud Removal System In +27000-ft Long Extended Reach Well
    P. Correa, Baker Hughes; M. Alhassan, Baker Hughes Co. Saudi Arabia
  • Alternate 231374
    Well Reservoir And Facility Management-guided Rigless Matrix Stimulation In A Behind-the-sleeve Gravel Pack: Coiled Tubing And Pressure Pumping Integration Restores 137% Production In The Niger Delta
    D.E. Oku, A. Mohammed, J. Ikhanoba, A. Aribatise, O. Hamid-Osazuwa, A.O. Adeniji, L.O. Aihevba, Asharami Energy Limited