Skip to main content
Loading

Operational Efficiency: Leveraging Technology for Smarter Interventions

Tuesday, 24 March
Waterway 2-3
Technical Session
This session showcases six technical papers presenting field-proven innovations in coiled tubing and wireline (e-line) operations. Each paper highlights new technologies and methods that improve the precision and reliability of diagnostics and intervention operations while minimizing rig time and overall intervention costs. The case studies emphasize how integrating intelligent tools and optimized operating practices can deliver safer, faster, and more cost-effective well interventions across a range of field conditions.
Session Chairpersons
Jason Burke - ConocoPhillips
Homero Castillo - Wireline Advisory Board
  • 1330-1355 231321
    Enhancing Pipe Recovery Operations Through Clean and Controlled E-Line Severance of 7 5/8" Casing in Challenging Well Conditions
    G. Murphy, Welltec; L. Craig, Mewbourne Oil Company; I. Hernandez-Reyes, Welltec
  • 1355-1420 231364
    Effects Of Coiled Tubing Injector Head Abrupt Stop On The Coiled Tubing Strings
    G. Alves, N. Molero, D. Santos, J. Taboada, SLB
  • 1420-1445 231320
    Identifying Casing Integrity Issues Through a Novel Cost-effective Wellbore Inspection: Industrial Pilots in Unconventional Fields
    Z. Tong, R. Wei, PetroChina Intl Ltd; F. Kong, CNPC USA; Q. Sun, PetroChina Intl Ltd; B. Dang, Xi'an Shiyou University; L. Zhang, Lanzhou University; Y. Fan, CNPC Well Logging; D. Jia, PetroChina Intl Ltd