Skip to main content
Loading

Operational Efficiency: Leveraging Technology for Smarter Interventions

Tuesday, 24 March
Waterway 2-3
Technical Session
This session showcases six technical papers presenting field-proven innovations in coiled tubing and wireline (e-line) operations. Each paper highlights new technologies and methods that improve the precision and reliability of diagnostics and intervention operations while minimizing rig time and overall intervention costs. The case studies emphasize how integrating intelligent tools and optimized operating practices can deliver safer, faster, and more cost-effective well interventions across a range of field conditions.
Session Chairpersons
Jason Burke - ConocoPhillips
Homero Castillo - Wireline Advisory Board
  • 1330-1355 231321
    Enhancing Pipe Recovery Operations Through Clean And Controlled E-line Severance Of 7 5/8" Casing In Challenging Well Conditions
    G. Murphy, Welltec; L. Craig, Mewbourne Oil Company; I. Hernandez-Reyes, Welltec
  • 1355-1420 231373
    High-strength Coiled Tubing Recovery With Spoolable Connectors: Testing And Lessons Learned
    K. Kaul, Halliburton Energy Svc.
  • 1420-1445 231320
    Identifying Casing Integrity Issues Through A Novel Cost-effective Wellbore Inspection: Industrial Pilot In Unconventional Fields
    Z. Tong, PetroChina Intl Ltd; H. Liu, Research Inst Petr Expl & Dev; Q. Sun, China Natl. Petroleum Corp.
  • Alternate 231317
    An Investigation Of Coiled Tubing Mechanical Properties For Effective Well Control
    K. Elliott, NOV; A. Buchanan, D. Solberg, Equinor ASA; E. Arriaga, A. George, NOV
  • Alternate 231364
    Effects Of Coiled Tubing Injector Head Abrupt Stop On The Coiled Tubing Strings
    G. Alves, N. Molero, D. Santos, J. Taboada, SLB
  • Alternate 231390
    First Deployment Of Coiled Tubing Friction Reduction Tool In Drilling Applications: Extending Reach And Unlocking New Economic Potential
    M. Ahsan, NOV