Skip to main content
Loading

Light Well Intervention (LWI): Maximum Impact, Minimal Footprint

Tuesday, 24 March
Waterway 1
Technical Session
Maximizing value from existing wells is a priority across the industry. This session examines how innovative intervention strategies can optimize efficiency, reduce costs, and capture hidden potential without added complexity. Case studies and best practices will demonstrate how focused actions extend well life, enhance recovery, and generate impact disproportionate to scale. Attendees will gain practical insights into achieving meaningful results through leaner operations, balancing efficiency with safety and sustainability in today's competitive energy environment.
Session Chairpersons
Ali Almusallam - Saudi Aramco
Chris Murphy - Recoil Energy Services
  • 0800-0825 231351
    Rapid E-line Tool Development Ensures Wellbore Access To Evaluate Further Operations By Opening Up A Collapsed Tubing In A Subsea Well From A LWI Vessel On The NCSs In Only 6 Days
    H.A. Langaker, E Plug AS; F.F. Heggestad, E Plug; J. Pettersen, A. Dalheim, D. Husebø, A. Popescu, E Plug AS; S. Le Maitre, Vision IO
  • 0825-0850 231398
    Enabling Riserless Subsea Wireline Interventions: A Step Change
    M. Billingham, SLB
  • 0850-0915 231396
    Pushing The Boundaries Of Slickline Operations: Bridge Plug Setting And Tubing Cut For Pre-rig With Digital Slickline In Offshore Malaysia
    M.A. Anuar, Deleum Oilfield Services Sdn Bhd; M. Mohd Zaky, Petronas Carigali SDN BHD; A. Mohd Taufik, N. Amat, N. Kamaruddin, Deleum Oilfield Services Sdn Bhd; A. Bin Ahmad Zaini, E. Samaile, Petronas Carigali Sdn Bhd; C.Y. Xiong, PETRONAS
  • 0915-0940 231359
    Restoration Of Adjustable Downhole Flow Control Capability In Deepwater Subsea Intelligent Multi-zone Completion By Utilizing Electric-line Stroker As A Liner Vertical Displacement Transducer Deployed Via Riserless Intervention Vessel
    L.W. Ramnath, BP America Inc
  • 1010-1035 231397
    Rapid Intervention Of 5.5″ Casing Remediation Using A Wireline Deployed Alloy And Resin Patch Technology
    G. Murphy, Welltec; A.R. Gregory, J. Henson, ExxonMobil Production Co.; E. Oeyan, B.E. Gunnarsson, Isealate; I. Hernandez-Reyes, Welltec
  • 1035-1100 231384
    High-force Wireline Intervention: Fishing And Recovery Of A Stuck Wireline Retrievable Patch Using An Axial Force Tool (AFT) In A Vertical Well
    R. Melander, Welltec; S. Prabhakaran, Welltec Inc
  • 1100-1125 231371
    Rigless Integrity Remediation: A Cost -effective Alternative To Traditional Workover In High-risk Gas Wells
    J. Perez Cordoba, A. RODRIGUEZ OTAVO, J. Marín Soto, B. Monroy, ECOPETROL
  • Alternate 231385
    Pushing The Boundaries Of Extended Reach Perforation In Horizontal Gas Wells: Advancements With Downhole Tractors And Selective Firing Systems
    A. Areepetta Mannil, L.C. Villagrana, I. Amirov, SLB
  • Alternate 231367
    Advanced Acid Foam And Relative Permeability Modifier (RPM) Integration For Matrix Stimulation In Mature Carbonates: Case Studies From The Baturaja Formation, Offshore North West Java
    R. Rizky, S. Sunaryo, K. Wibowo, PT Pertamina Hulu Energi ONWJ; S. Santos, R. Maryam, Halliburton