Skip to main content
Loading

Light Well Intervention (LWI): Maximum Impact, Minimal Footprint

Tuesday, 24 March
Waterway 1
Technical Session
Maximizing value from existing wells is a priority across the industry. This session examines how innovative intervention strategies can optimize efficiency, reduce costs, and capture hidden potential without added complexity. Case studies and best practices will demonstrate how focused actions extend well life, enhance recovery, and generate impact disproportionate to scale. Attendees will gain practical insights into achieving meaningful results through leaner operations, balancing efficiency with safety and sustainability in today's competitive energy environment.
Session Chairpersons
Chris Murphy - Recoil Energy Services
  • 0800-0825 231351
    Rapid E-Line Tool Development Restores Wellbore Access by Opening Collapsed Tubing in a Subsea Well from an LWI Vessel on the NCS in Just 6 Days
    H.A. Langåker, E Plug AS; F.F. Heggestad, E Plug; J. Pettersen, A. Dalheim, D. Husebø, A. Popescu, E Plug AS; S. Le Maitre, Vision IO
  • 0825-0850 231398
    Enabling Riserless Subsea Wireline Interventions: A Step Change
    M. Billingham, J. Paterson, A. Zahmuwl, I. McDaniel, SLB; C.G. Orih, TotalEnergies
  • 0850-0915 231396
    Pushing the Boundaries of Slickline Operations: Bridge Plug Setting and Tubing Cut for Pre-Rig with Digital Slickline in Offshore Malaysia
    M.A. Anuar, A. Mohd Taufik, N. Kamaruddin, Deleum Oilfield Services Sdn Bhd; C.Y. Xiong, K. Khairul Anuar, PETRONAS; M. Ramli, Deleum Oilfield Services Sdn Bhd
  • 0915-0940 231359
    Restoration Of Adjustable Downhole Flow Control Capability in Deepwater Subsea Intelligent Multi-Zone Completion by Utilizing Electric-Line Stroker as a Linear Vertical Displacement Transducer Deployed via Riserless Intervention Vessel
    L.W. Ramnath, BP America Inc; S. Obrien, BP Exploration
  • 1010-1035 231397
    Rapid Intervention of 5.5in Casing Remediation Using a Wireline-Deployed Alloy and Resin Patch Technology
    A.R. Gregory, J. Henson, ExxonMobil; B.E. Gunnarsson, E. Oeyan, G. Murphy, Welltec
  • 1035-1100 231385
    Pushing The Boundaries of Extended Reach Perforation in Horizontal Gas Wells: Advancements with Downhole Tractors and Selective Firing Systems
    A.M. Afsal, A. Korolyov, L.C. Villagrana, I. Amirov, R. Gaidanov, K. Sukharev, SLB; A. French, WWT International Inc.
  • 1100-1125 231371
    Rigless Integrity Remediation A Cost -effective Alternative to Traditional Workover in High-risk Gas Wells
    J. Perez Cordoba, A. Rodriguez Otavo, J. Marín Soto, Ecopetrol; W. Castañeda, B. Monroy, C. Ibañez, Meridian Consulting; J. Sanchez, Baker Hughes