Skip to main content
Loading

Intervention in Harsh and Extreme Environments

Tuesday, 24 March
Waterway 4
Technical Session
Explore breakthrough intervention technologies engineered for the most demanding well environments, including deepwater, sour service, and extended-reach laterals. Presentations will detail advanced electric line pipe recovery tools, drop-ball activated jarring systems, and quench-and-temper coiled tubing innovations. These solutions address challenges such as stuck completions, high-pressure sour gas exposure and fatigue in long horizontal wells. Attendees will gain insights into diagnostic precision, metallurgical resilience, and adaptive planning that restore wellbore access, reduce non-productive time, and improve operational safety and efficiency in high-risk, high-performance interventions.
Session Chairpersons
Eusebio Duque - Baker Hughes
Manuel Chavez - Shell
  • 1330-1355 231346
    Effective Remediation For A Stuck Completion String Including Multiple Set Packers In A Deepwater Well Using Advanced Electric Line Pipe Recovery Technologies
    P. Davis, Baker Hughes Solutions; B. Taylor, Baker Hughes; T. Chase, Chevron Drilling & Completions; R. Gomez Simancas, Chevron Corporation; G. Ransonet, Baker Hughes; L. Samano, Chevron Products Co.; C. Wright, Chevron Corporation
  • 1355-1420 231332
    Novel Fluid Placement Strategy: Lab-to-Field Execution for A Coiled Tubing Gas Shut-Off Treatment in a Highly Deviated Offshore Well
    A. Gomaa, M. Youssef, A. Ismayilova, BP; K. Mahadev, BP America Inc; M. Allahverdiyev, BP plc; M. Aliyev, BP Azerbaijan Baku; I.A. Guliyev, BP AGT; A.L. Hughes, BP America Inc; A. Arfi Syifaa'I, SLB Technology Corp.; S. Tin, N. Abbasov, J. Zeynalov, A. Kumar, SLB; A.E. Taghiyev, Baker Hughes
  • 1420-1445 231392
    Bridging Strength and Sour Service Integrity for Unconventional Well Interventions In 15,000+ FT Laterals with Quench and Temper Grade 95 Coiled Tubing
    I.I. Galvan, G. Mallanao, R. Rowland, FET Global Tubing; M.J. Jarour, NESR