Horizontal and Multilateral Well Solutions
Tuesday, 24 March
Waterway 4
Technical Session
The industry continues to push the limits of lateral length in each wellbore, regardless of reservoir, lateral count, completion design or TVD. This session both highlights the challenges and showcases innovative solutions to the complex problems of accessing, remediating or stimulating multilaterals, as well as reaching and drilling frac plugs at extreme depths.
-
0800-0825 231322Worlds First Post Frac Plug Drill Out Utilizing 2-7/8” Coiled Tubing: Results, Lessons, and a Path Forward
-
0825-0850 231327Utilizing Wireline Deployed Mechanical Puncher to Optimize Completion Deployment Operations In Extended Reach Wells In SAGD Oilfields
-
0850-0915 231386Coiled Tubing Extended Reach Solutions, Breaking the Barrier Of 4-mile Well Laterals in the U.S.
-
0915-0940 231394Go Further: Field Validation of Split-String Coiled Tubing for Extended-Reach Operations
-
1010-1035 231347Coiled Tubing Multilateral Extended Reach Stimulation with Electrical Multilateral Entry Tool, Hydraulic Tractor, and Electrical Circulation Valve
-
1035-1100 231395An Alternative Cost-Effective Approach to Stuck Pipe Prevention and Remediation. One Coiled Tubing Company’s Experience Based on Over 1000 Coiled Tubing Runs
-
1100-1125 231314Hydraulic Oscillation-based Friction Reduction for Enhanced CT Reach in Extended Reach Horizontal Wells; A Case Study From UAE
