Skip to main content
Loading

Horizontal and Multilateral Well Solutions

Tuesday, 24 March
Waterway 4
Technical Session
The industry continues to push the limits of lateral length in each wellbore, regardless of reservoir, lateral count, completion design or TVD. This session both highlights the challenges and showcases innovative solutions to the complex problems of accessing, remediating or stimulating multilaterals, as well as reaching and drilling frac plugs at extreme depths. 
Session Chairpersons
Jesus Barraza - Chevron
Wes Hill - Global Dynamics
  • 0800-0825 231322
    Worlds First Post Frac Plug Drill Out Utilizing 2.875" CT
    J. Burke, ConocoPhillips Co; C. Schneider, Cudd Pressure Control; K.J. Baros, ConocoPhillips
  • 0825-0850 231325
    Redefining Complex Well Interventions: Global First Water Shutoff In A 3 Legged Multilateral Well Using Realtime Hybrid Fiber Optic Coiled Tubing And Openhole Straddle Packer, Unlocking Dormant Potential In North Kuwait Carbonate Reservoirs
    A. Al-Osaimi, E. Al-hammadi, A. AL-Hassan, Kuwait Oil; M. Slama, SLB
  • 0850-0915 231386
    Coiled Tubing Extended Reach Solutions, Breaking The Barrier Of 4-mile Well Laterals In The US
    J.H. Myatt, Gladiator Energy; I. Galvan, Global Tubing
  • 0915-0940 231394
    Go Further: Field Validation Of Mid-string Extended-reach System To Expand Coiled Tubing Depth Capability
    P. Jeschke, B. Watson, STEP Energy Services
  • 1010-1035 231347
    Coiled Tubing Multilateral Extended Reach Stimulation With Electrical Multilateral Entry Tool, Hydraulic Tractor, And Electrical Circulation Valve
    W. Tapia, N. Molero, SLB; A. Saeed, M. Valiyev, Saudi Aramco
  • 1035-1100 231395
    Alternative Approach To Stuck Coil Prevention And Remediation
    K. Jones, Tenax Energy Solutions
  • 1100-1125 231314
    Hydraulic Oscillation-based Friction Reduction For Enhanced CT Reach In Extended Reach Horizontal Well; A Case Study From UAE
    A. Nadeem, B. Ahmad, M. Subaihi, ADNOC Onshore; M. Al Bloushi, ADNOC; M. Varshney, ADNOC Onshore; Y.K. Maheshwari, ADNOC; A. Adnan, ADNOC Onshore
  • Alternate 231379
    Pumpdown Plug-and-perf Operational Challenges: Hazards With Polymer-coated Electromechanical Cables
    H.C. Castillo, Wireline Advisory Board LLC
  • Alternate 231345
    Bringing Geosteering Efficiency To Coiled Tubing Drilling Operations On The North Slope Of Alaska
    A. Miszewski, AnTech Ltd
  • Alternate 231327
    Utilizing Wireline Deployed Mechanical Puncher To Optimize Completion Deployment Operations In Extended Reach Wells In SAGD Oilfields
    D. Shumakov, Welltec Canada; N. Van Der Merwe, Canadian Natural Resources Ltd
  • Alternate 231348
    Enhancing Efficiency Through Integrated Multi Cluster Perforating And Acid Stimulation Operations
    H. Al-obaid, S. Ashby, Saudi Aramco SAOO; Y. Kaipov, SLB; A. Al Aqeel, Saudi Aramco SAOO