Skip to main content
Loading

Cross-Industry and Non-Traditional Applications

Tuesday, 24 March
Waterway 4
Technical Session
This session highlights innovative well intervention practices that extend beyond traditional oil and gas operations and demonstrate the versatility of coiled tubing and related technologies. Presentations include geothermal live-well scale cleanout under extreme temperature conditions, the development of a cement packer methodology for control line constrained annuli, and a machine learning approach for proactive well integrity management. Case studies also feature achieving full accessibility in a 18,900-ft ultra-extended reach lateral and the evolution of magnetic ranging with coiled tubing drilling for complex wellbore interception. Attendees will gain cross-industry insights, operational lessons, and exposure to emerging non-traditional applications.
Session Chairpersons
Xaymaca Bautista - SLB
Irma Galvan - FET - Global Tubing
  • 1515-1540 231376
    The Evolution Of Magnetic Ranging With Coiled Tubing Drilling Applications: Development Through Three Case Histories
    T. Menard, C. Schneider, Cudd Pressure Control
  • 1540-1605 231342
    Case Study From Indonesia: Live Well Coiled Tubing Scale Cleanout In A High-temperature Geothermal Well — Operational Challenges And Key Learnings
    H. Arstianti, R. Wijaya, A. Cahyono, A. Terry, H. Marantika, Baker Hughes
  • 1605-1630 231352
    From Yard To Field: Engineering A Cement Packer Methodology In The Presence Of Control Line-constrained Annuli Filled With Low-viscosity Resin And Validated Through Acoustic Logging Interpretation
    M. Gaeta, SMAPE Srl.; D. BARONE, Eni S.p.A.; F. Stangoni, Eni SPA E&P Division; G. Stanziale, Eni; M. Rinaldi, A. Mangione, Eni S.p.A.; S. Keci, C. Groner, Halliburton; F. Setale, A. Di Antonio, SMAPE Srl.
  • Alternate 231400
    Machine Learning For Smarter Well Integrity Management
    P. Ashok, The University of Texas at Austin; K. Sudyodprasert, PTTEP; E. van Oort, The University of Texas At Austin; J. Dahlem, Hess Corp.
  • Alternate 231370
    2-in Coiled Tubing Achieves 100% Accessibility In 18,900 Ft Lateral Of Ultra-extended Reach Well: A Case History In UAE
    B. Gopalan, R.I. Ortega Alfonzo, Baker Hughes; S. Li, M.T. Bukhari, ADNOC Offshore; D.H. CIPPITELLI, Baker Hughes Ltd