Skip to main content
SPE Logo ICoTA

SPE/ICoTA Well Intervention Conference and Exhibition
24–25 March 2026
The Woodlands, Texas, USA

2024 Technical Program

Coil Tubing

Loading

Latest Advancements in Digital Applications, Downhole Tools, Surface Equipment and Materials for Well Intervention

Tuesday, 19 March
Waterway 4
Technical Session
In this session, we will touch on recent industry advancements and how they are impacting operations and knowledge globally. These papers dive into some of the novel topics that potentially “move the needle” in their respective fields of study. Join us as we discuss topics relative to system automation, a deeper understanding of coiled tubing strings, and advance downhole operations. This is expected to be wellbore intervention at its finest.
Chairperson
Irma Galvan - FET-Global Tubing
Heath Myatt - Gladiator Energy
  • 0800-0825 218349
    Automation - Continuing to Improve Service Delivery of Coiled Tubing Operations
    S. Craig, L. Pinero, A. Terry, B. Lindsey, Baker Hughes
  • 0825-0850 218332
    Development and Initial Trials of Thermally Processed 95-ksi Coiled Tubing
    K. Elliott, NOV; N. Molero, H. Srinivasan, SLB; E. Arriaga, F. Al Qatari, NOV; M. Alsheheri, Saudi Aramco
  • 0850-0915 218335
    Understanding Mechanisms of Wellbore Abrasion During Coiled Tubing Intervention
    J. Campos, A. Keong, Z. Liu, SLB; D. Tomczak, T. Kleppan, M. Soerensen, Aker BP ASA
  • 0915-0940 218363
    Rethinking Coiled Tubing String Lifespan Assessment: Leveraging Frequent Inspections for Enhanced Operational Insights
    B. Rath, B. Watson, J. Glanville, STEP Energy Services
  • 1010-1035 218316
    Advanced Dual Electro-Optical Telemetry System Enhances Reliability in Coiled Tubing Electrical Plug Setting And Retrieval Operations
    A.M. Afsal, A. Abouganem Stephens, L.C. Villagrana, J. Delaune, S. Rondon Fajardo, W.R. Tapia, R. Ryan, SLB; H.A. Langaker, T.H. Bode, E Plug
  • 1035-1100 218340
    Technology Application Bringing Highly Accurate Answers to Free Pipe Determination, Enabling Operational Certainty and Efficiency, Delivering Optimized Tubular Recovery
    B. Taylor, S. Murchie, Baker Hughes
  • 1100-1125 218331
    Casing Inspection And Cement Evaluation On Drillpipe: Logging In Parallel With Existing Intervention Runs
    A. Hawthorn, D. Groves, G. Osunjaye, Baker Hughes
  • 1125-1150 218360
    Autonomous Restriction Navigation Through Wellbore in Wireline and Slickline Operations
    S. DiPasquale, J. Meirkhan, SLB