Skip to main content
Loading

Intervention Solutions in Extreme Well Conditions

Wednesday, 20 March
Waterway 1-3
Technical Session
From ultra-low reservoir pressure cleanouts to high-alloy gas lift installations; from steam injection well completions to evaluating CT performance in extended-reach wells, this session will cover solutions to well intervention and completion challenges in extreme well environments.
Chairperson
Khalid Rahimov - Baker Hughes
Patrick Kelleher - Athena Engineering Services
  • 1015-1040 218311
    Challenging Foam Sand Cleanout Operation in Ultra-low Reservoir Pressure Wells Resumes Production in A CBM Field
    S. Craig, Baker Hughes; A. Gupta, Baker Huges; B. Kumar, Baker Hughes
  • 1040-1105 218346
    Safe and Successful Restoration Of Wellbore Accessibility By Wellhead Gate Valve Milling
    K. Al-Mulhem, Saudi Aramco SAOO; M. Muraikhi, Saudi Aramco; M. Alsaleh, M. Almaghlouth, Saudi Aramco SAOO
  • 1105-1130 218323
    Integrated Downhole-Measurement-Enabled Coiled Tubing and Mechanical Wireline Recovery of E-line Cable in A Live, Sour Gas Well
    L.C. Villagrana, A. Abouganem Stephens, A. Areepetta Mannil, M. Al Dahhan, J. Delaune, W.R. Tapia, A. Mohamed Naceur, SLB
  • 1130-1155 218321
    Deciphering the well complexity index for Coiled Tubing Interventions, a unique factor for better engineering and operational planning
    R. Ottolina Grunichev, ADNOC Onshore; G. Ambrosi, Halliburton Worldwide Ltd.