Beyond Reach Coiled Tubing Solutions in Horizontal and Multilateral Wells
Tuesday, 19 March
Waterway 1-3
Technical Session
As the industry moves towards minimizing it’s carbon footprint while maximizing the production from reservoirs, horizontal completions are becoming more common. Extended-reach intervention challenges are required to be met and push the limits to be able to accomplish the desired requirements.
-
0800-0825 218302Step Change In CTD Strategy Of Multilateral Drilling Using Under-balanced Coiled Tubing Drilling (UBCTD ) Technique In An Onshore Sour Gas Field-UAE -Case Study
-
0825-0850 218343Milling the Unmillable: Design, Testing and Execution for Milling Non-Rotationally Locked Frac Sleeves
-
0850-0915 218371How a New On-Command Downhole Control System is Breaking the Efficiency and Sustainability Paradigm in Multilateral Stimulations
-
0915-0940 218324Successful Intervention In “U” and “W” Shaped Wells In Eagleford Basin - A Case History
-
1010-1035 218322Record-Setting Workover Saves Extended Marcellus Lateral
-
1035-1100 218365Conveying Extended Reach Solutions: First Coiled Tubing Perforation in Horizontal Live Gas Wells with Downhole Tractors
-
1100-1125 218333Slim Hole Thru-tubing Casing Exit on Coiled Tubing: A Case Study Discussing the State-of-the-art in Casing Exits for a Coiled Tubing Drilling Project in Israel
-
1125-1150 218354Improving The Effectiveness Of Rig-based Interventions In Tri-lateral Oil Producers: Harnessing Advanced Coiled Tubing Optical Telemetry Fused with Single-phase Retarded Inorganic Acid System: A State-of-the-art Study from The North Kuwait Field.