S06 Well Construction and Integrity
Wednesday, 3 December
Cascade Ballroom
Technical and Invited Presenter
This session examines critical aspects of thermal well construction and integrity, focusing on innovative approaches to liner deployment, casing integrity, and flow control under challenging thermal conditions. Mechanics of static friction, casing connection evaluations, and flow control device qualification are explored specific to thermal operations – including extended reach and shallow, vertically spudded wells. Gain actionable insights into liner deployment strategies, casing design, and integrity durability—key levers for safe, efficient, and reliable thermal well performance.
-
1100-1130Initial Investigation into the Role of Static Friction in Extended Reach Liner Running
-
1130-1200Intermediate Casing Connection Evaluation for Vertical-Spud Shallow SAGD Applications
-
1200-1230 230267Strain-Based Load Qualification Testing of Flow Control Devices
-
AlternateManaging Uncertainty in SAGD Wells with Deformation-Tolerant Liner Designs