Skip to main content

Technical Program 2024

 

SSI

Loading

Optimizing Technology

Wednesday, 14 August
Grand Ballroom AB
Technical_and_Invited_Presenter
Interventions have been undertaken using riser and riserless subsea well access methods for decades.  As such these methods could be considered as being established and mature technologies.  This level of acceptance gives rise to the conditions that allow for them to be optimized by improving connections, control, communication with the aim of increasing efficiency.  Optimization of operations and delivery time can also be achieved by utilizing established methods.  This session presents some optimizations that have been achieved and, hopefully, will inspire attendees to find other opportunities.
Chairperson
Travis Stinson - TechnipFMC
Alexander Crabtree - Oceaneering International, Inc.
  • 1000-1030  
    Deepwater Subsea Rig Workovers: Rapid Response And Continuous Improvement
    C. Hupp, J.C. Rivet, bp
  • 1030-1100 00000
    Intervention & Completion Landing String Qualification For HPHT Applications
    L. Karlapalem, NOV Inc.; L. Hehn, G. Brown, NOV Grant Prideco; A. Muradov, NOV Inc.; D. Pattillo, Occidental Petroleum; S. Dighe, Viking
  • 1100-1130  
    Utilizing ROCS For Operating Tubing Hanger Running Tool In Deepwater Gom
    S. Loyd, Halliburton Energy Services Group; B. Stiel, ENI Petroleum Operating Inc
  • Alternate 220599
    Pushing The Boundaries - Optimizing For Riserless Intervention Deepwater GOM
    P. Balaster, Baker Hughes