10 Technical Session 10: Production Enhancement II
Wednesday, 3 December
Grand Ballroom 3, Level 6A
Technical Session
-
1400-1420 228470Water Shut Off Using Bismuth Based Alloy Deployed Via A Real Time Catenary Coiled Tubing System
-
1420-1440 228528Application Of An Innovative Degradable Particulate Diverter Technology For Effective Acid Diversion In High Water Cut, High Permeability Contrast Reservoirs — A Case Study From Offshore Malaysia
-
1440-1500 228503Overcoming Well Id Restrictions: Successful Application Of Auto Gun Release (agr) For Optimising Perforation Operations
-
1500-1520 228514Unlocking A Blocked Screened Gas Well Using A Specialised Filter Cake Dissolver With Coiled Tubing
-
Alternate 228460Revival Of Idle Well Through Reperforation: A Case Study Of Utilising Small Perforation Gun In Mature Oil Field
-
Alternate 228504Surface Monitoring Algorithm Replaces Downhole Completions For High Temperature Acidizing
-
Alternate 228542Acid Stimulation In Water Injector: Managing Formation Clogging Under Sustained High Tubing Head Pressure
-
Alternate 228491A Success Story In Enhancing Filed Recovery Factor Through Well Interventions