0900-0920 228508First in the World, Slim Through Tubing Cement Evaluation for B-Annulus Section Run Through 3-1/2” Production Tubing and 9-5/8” Casing for Slot Recovery Strategy
-
0920-0940 228447Cost Reduction in Well Abandonment Operations, Utilising One Trip Solution for Casing Recovery and Advance Cutting Inserts Technology for Wellhead and Conductor Recoveries
-
0940-1000 228468Annular Remediation Learnings and Optimisation Opportunities from A Multi-Well Decommissioning Project in Peninsular Malaysia
-
1000-1020 228474Implementation of Run-Saving Techniques with Coiled Tubing to Optimise and Shorten Well Abandonment Sequence