Skip to main content

SPE Logo      ICoTA Logo

SPE/ICoTA Symposium and Exhibition: Well Intervention
2–3 December 2025 | Kuala Lumpur, Malaysia

Technical Programme

Subpage Hero

Loading

08 Technical Session 08: Well Abandonment

Wednesday, 3 December
Grand Ballroom 2, Level 6A
Technical Session
Session Chairpersons
Muhammad Nabil Ghazali - PTTEP Sarawak Oil Limited
Jamie Stewart - Weatherford
  • 0900-0920 228508
    First in the World, Slim Through Tubing Cement Evaluation for B-Annulus Section Run Through 3-1/2” Production Tubing and 9-5/8” Casing for Slot Recovery Strategy
    N. Mohd Noor, I. Mohd Zain, M. Ariffin, A. Fadjarijanto, Jadestone Energy (Malaysia) Pte. Ltd.; M. Jumaat, K. Singh, S. Bose, A. Abd El Raouf, N. Chansiriwilaikul, SLB; C. Kin Khong, Independent
  • 0920-0940 228447
    Cost Reduction in Well Abandonment Operations, Utilising One Trip Solution for Casing Recovery and Advance Cutting Inserts Technology for Wellhead and Conductor Recoveries
    M.Z. Khan, S. Swadi, Wellbore Integrity Solutions
  • 0940-1000 228468
    Annular Remediation Learnings and Optimisation Opportunities from A Multi-Well Decommissioning Project in Peninsular Malaysia
    A. Lucas, N. Noordin, PETRONAS Carigali Sdn Bhd; P.A. Inthirachithu, Archer Well Company (M) Sdn Bhd; M. Jumaat, SLB; A.S. Zainuddin, N. Abdul Wahab, B.D. Stevens, PETRONAS Carigali Sdn Bhd
  • 1000-1020 228474
    Implementation of Run-Saving Techniques with Coiled Tubing to Optimise and Shorten Well Abandonment Sequence
    M. Hossain, Chevron Bangladesh; S. Gutleber, Weatherford