01 Technical Session 01: Coiled Tubing
Tuesday, 2 December
Grand Ballroom 3, Level 6A
Technical Session
-
1130-1150 228451Mastering Complexity: Innovative Engineering Solutions For Risk Reduction And Efficiency In Coil Tubing Perforation In Carbonate Underbalance Sour Gas Wells
-
1150-1210 228544Executing Highly Efficient Well Intervention Operation With Coiled Tubing Catenary, Achieving Milestone In North Sabah, Malaysia
-
1210-1230 228459Out Of The Box Approach For Well Productivity Improvement On Long Horizontal Open Hole Tight Carbonate Formation
-
1230-1250 228537Optimised Coiled Tubing Intervention Strategies For Extended Reach Wells: Insights From A 30+ Well Campaign In Iraq
-
Alternate 228461Case History Coiled Tubing Application During Drill Stem Test Blockage In An Ultra-deep Subsea Well First Time In Malaysia
-
Alternate 228448Operation Optimisation Of Cement Packer & Added Perforation With Coiled Tubing Conveyance: Case Study In Sarawak Waters
-
Alternate 228534Enhancing Success Rates Of Rigless Squeeze- Cementing Operations Using Crosslinked Polyacrylamide Gel For Water Shutoff In Sandstone Wells
-
Alternate 228520Breakthrough Conformance Technology For Water Shutoff Using Novel Coiled Tubing Cementing Application: Design, Implementation And Post Evaluation Learnings From Kuwait