01 Technical Session 01: Coiled Tubing
Tuesday, 2 December
Grand Ballroom 3, Level 6A
Technical Session
-
1130-1150 228451Optimising Perforation Strategies in Challenging Trajectories: Insights From 3D Computational Fluid Dynamics in Sour Gas Well Completion
-
1150-1210 228544Executing Highly Efficient Well Intervention Operation with Coiled Tubing Catenary, Achieving Milestone in North Sabah, Malaysia
-
1210-1230 228459Out of the Box Approach for Well Productivity Improvement on Long Horizontal Openhole Tight Carbonate Formation
-
1230-1250 228537Optimised Coiled Tubing Intervention Strategies for Extended Reach Wells: Insights from A 30+ Well Campaign in Iraq
-
Alternate 228461Case History: Coiled Tubing Application During DST Blockage in an Ultra-Deep Subsea Well
-
Alternate 228448Operation Optimisation of Cement Packer & Added Perforation with Coiled Tubing Conveyance: Case Study in Sarawak Waters
-
Alternate 228520Breakthrough Conformance Technology for Water Shutoff Using Novel Coiled Tubing Cementing Application: Design, Implementation, and Post-Evaluation Learnings from Kuwait

