Skip to main content

Programme Schedule

Subpage Hero

Loading

05 Technical Session 5: Best Practices, Lessons Learnt and Technological Breakthroughs: Well P&A Integrity

Wednesday, 12 November
Room 2, Perth Convention and Exhibition Centre
Technical Session
Chairperson
Syah Mohamad - Baker Hughes
Jamie Stewart - Weatherford
  • 1030-1050 228592
    First Downhole Application Of A Novel Through-tubing Cement Evaluation Technology
    M. Larbi Zeghlache, Saudi Aramco PE&D; A.A. Tarasov, Q. Yang, M. Rourke, GOWell International
  • 1050-1110 228582
    Well Re-entry For A Permanent Well p&A In Deepwater - Case Study
    F. Zapata Bermudez, Archer Oiltools LLC
  • 1110-1130 228568
    Usage Of A Coiled Tubing PWC Tool To Abandon Two Wells With Surface Casing Vent Flow On Onshore Australia
    M.A. Jaculli, E. Engelsgjerd, P. Andersen, I. Holm, HydraWell Intervention; J. Mignano, AGL Energy Ltd
  • 1130-1150 228576
    Legacy Well p&A Considerations And Challenges For Ccs Projects
    F. Gui, S. Mohamad, Baker Hughes
  • Alternate 228561
    Using Winchless Dynamic Un-spooling Fibre Optic DTS And Slow Strain DAS Data Corroboration To Diagnose Sustained Casing Pressure Source In An Australia Land Well
    R. Crawford, Well Sense Technology
  • Alternate 228573
    Optimizing Well Retirement Through Data-driven Plug And Abandonment Advisory Workflow: A Comprehensive Framework For Prioritization And Risk Management
    A. Sinha, B. Bhatt, SLB
  • Alternate 228580
    Annulus Wash And Cement Assurance For Reliable Barrier Placement: Integrating Diagnostics And Field Learning In p&A Operations
    N. Saidi, Archer Well
  • Alternate 228594
    Plug And Abandonment Barrier Verification In Western Australia's Class A Nature Reserves
    D. Kundich, TGT Diagnostics
  • Alternate 228554
    Reinventing Well Integrity Barriers: Next-Gen SAP-B Curing & Targeted Reservoir Isolation For Offshore Island Well
    M. Ansari, D. Soni, ADNOC Onshore