05 Technical Session 5: Best Practices, Lessons Learnt and Technological Breakthroughs: Well P&A Integrity
Wednesday, 12 November
Room 2, Perth Convention and Exhibition Centre
Technical Session
-
1030-1050 228592First Downhole Application Of A Novel Through-tubing Cement Evaluation Technology
-
1050-1110 228582Well Re-entry For A Permanent Well p&A In Deepwater - Case Study
-
1110-1130 228568Usage Of A Coiled Tubing PWC Tool To Abandon Two Wells With Surface Casing Vent Flow On Onshore Australia
-
1130-1150 228576Legacy Well p&A Considerations And Challenges For Ccs Projects
-
Alternate 228561Using Winchless Dynamic Un-spooling Fibre Optic DTS And Slow Strain DAS Data Corroboration To Diagnose Sustained Casing Pressure Source In An Australia Land Well
-
Alternate 228573Optimizing Well Retirement Through Data-driven Plug And Abandonment Advisory Workflow: A Comprehensive Framework For Prioritization And Risk Management
-
Alternate 228580Annulus Wash And Cement Assurance For Reliable Barrier Placement: Integrating Diagnostics And Field Learning In p&A Operations
-
Alternate 228594Plug And Abandonment Barrier Verification In Western Australia's Class A Nature Reserves
-
Alternate 228554Reinventing Well Integrity Barriers: Next-Gen SAP-B Curing & Targeted Reservoir Isolation For Offshore Island Well