27 Innovative Technology: Well Integrity Technology I
Tuesday, 13 May
Meeting Room 10
Technical Session
Session Chairpersons
-
1530-1550 225019Reduced Portland Self-Healing Cement System for CO2 Environment Wells
-
1550-1610 225047Cutting-Edge Wellhead Support to Secure Subsiding and Unstable Onshore Wells: Casing and Structural Rehabilitation Methodology
-
1610-1630 225012Optimizing Casing Design in Mature Middle East Fields: Foam Cementing Technology as a Diverter Valve Tool Alternative
-
1630-1650 225018Innovative Scouring Spacer Applied in Liners Cementation Enhanced Zonal & Cement Bond Logs
-
Alternate 225004Casing Connection Integrity Prediction Technique for Underground Storage and High Thermal Downhole Environments
-
Alternate 225016In-house Synthesized Amphoteric Amphiphiles for Shale Swelling Inhibition and Wellbore Integrity Enhancement in Oil and Gas Reservoirs
-
Alternate 225031Evaluation of a Spacer System for Enhanced Well Cementing and Integrity in Challenging Formations
-
Alternate 225040Application of Prevent Casing Deformation for Horizontal Wells in Unconventional Resource