11 Gas Development: Stimulation and Carbonate Acidising
Monday, 12 May
Meeting Room 12
Technical Session
Session Chairpersons
-
1600-1620 224887Enhanced Gas Production Through Analysis, Skin Calculation Utilizing Dual-Method Stimulation: CTU Integrating Pre-Stimulation and High-Rate Matrix Acidizing Using a Novel Retarded Acid System
-
1620-1640 224852Re-stimulation of Non-producing Jurassic Gas Well with Multi-Stage Open-hole Completion Using CO2 Acid Fracturing Revives the Production Potential in Jurassic HPHT Depleted Reservoir in North Kuwait
-
1640-1700 224885Unlocking The Well Potential with a Novel Solids-Free Acid Diverter System in Middle Eastern Stimulation Operations
-
1700-1720 224899Constructing Flow Capacity of Fracture Networks in Deep Carbonate Reservoir Through Hybrid Acid Stimulation
-
Alternate 224838A Novel Water-Less Horizontal Well Fracturing Solution in Water-Sensitive and Low-Resistivity Tight Gas Reservoir
-
Alternate 224886Simulation-Based Optimization of Gas Storage Reservoir through Acidizing