23 Gas Development: Gas Production System Optimisation
Tuesday, 13 May
Meeting Room 12
Technical Session
-
1330-1350 224926Automated Intermittent Production (AIP) Technology: Enhancing Gas Well Uptime through Automated Control Systems
-
1350-1410 224936Block 61 Condensate Decline Management Strategy
-
1410-1430 224921Assessment of Methanol Consumption Reduction at Gas Treatment Facilities through Non-Fire Regeneration of Water-Methanol Solution - Methanol Stripping
-
1430-1450 224965Condensate Optimization Using Physical-based Models in Tight Gas Field in Oman Block 10
-
Alternate 224961Optimizing Acid Gas Sweetening Operations: Addressing Foaming and Solvent Degradation Challenges
-
Alternate 224955A Case Study: Review of Mic Screening Assessment and Mitigation in Deep water Sub sea Gas Production System
-
Alternate 224969Effective Options Utilized to Reduce Risk for Fault Critical Re-active Stress Evaluation
-
Alternate 224945A Research on Maximizing Gas Storage and Oil Recovery in Gas Condensate Reservoirs