093 Well Stimulation and Intervention IV
Thursday, 18 September
Room 16
Technical Session
Session Chairpersons
-
0830-0850 227585Optimizing Underbalance Coiled Tubing Descaling Operations: Leveraging Downhole Telemetry for Operational Efficiency
-
0850-0910 227485Iron Precipitation and Secondary Plugging During Acid Removal of Hematite-based Filter Cakes
-
0910-0930 226898A Remarkable 20% Oil Production Increase Through The Integration of Array Production Logging Data Analysis and Acid Stimulation Design and Optimization . A Case Study, Offshore Abu Dhabi.
-
0930-0950 227103Novel Acoustic Cement Evaluation Technology Opens the Gates for Reservoir Completions Behind Double Casing Strings. South-east Kuwait - Case Study
-
Alternate 227036Experimental Study on the Impact of Hydrogen Peroxide on the Alteration of Shale Properties during the Oxidative Dissolution Process
-
Alternate 226982A Paradigm Shift in Well Intervention Using Advanced Wireline Tractor for Challenging Horizontal Completions