093 Well Stimulation and Intervention IV
Thursday, 18 September
Room 16
Technical Session
Session Chairpersons
-
0830-0850 227585Optimizing Underbalance Coiled Tubing Descaling Operations: Leveraging Downhole Telemetry For Operational Efficiency
-
0850-0910 227822Innovative Application Of Single - Phase Retarded Acid Foams For Effective Stimulation Of Brownfield Reservoirs In Mumbai Offshore
-
0910-0930 227139Reduction Of Water Production In A Gas Well Through The First Field Application Of A Unique Chemical Plug To Isolate Water Producing Zone
-
0930-0950 227485Investigation Of Formation Damage Induced By Hematite Weighting Material During Filter Cake Removal
-
Alternate 227036Experimental Study Of Hydrogen Peroxide-shale Interactionduring Oxidative Dissolution Process
-
Alternate 227812Evaluating Compatibility Of Rock-Hardening Additives With Fracturing Fluids
-
Alternate 226982A Paradigm Shift In Well Intervention Using Advanced Wireline Tractor For Challenging Horizontal Completions
-
Alternate 227103Novel Acoustic Cement Evaluation Technology Opens The Gates For Reservoir Completions Behind Double Casing Strings. South-east Kuwait - Case Study