121 Well Completion and Production Monitoring IV
Thursday, 18 September
Room 16
Technical Session
Session Chairpersons
-
1530-1550 226850Microstructure Behavior Of Fly Ash-based Geopolymer Cement Exposed To Acidic Environment For Oil Well Cementing
-
1550-1610 227100Downhole Leak Detection Using High Frequency DAS And DTS Signals From Fiber Optics Cables
-
1610-1630 227669Technological Advancements In The Development Of High Temperature Remedial Conformable Sand Control Systems For Use In High-rate Gas Wells
-
1630-1650 226875Fiber Optics Reservoir Monitoring System Sustainability In Extreme Gas Well Conditions
-
Alternate 226869Utilizing Advanced Sectorial Electromagnetic Technology To Tackle Well Integrity Issues
-
Alternate 227610Improvement In Geothermal Well Integrity: A Review Of New Advanced Cementing Technologies
-
Alternate 227285Optimization Of Offshore Production In Real-time Intelligent Completion Operation With Use Of Reservoir-wellbore Dynamic Coupling Analysis Methods