Skip to main content

SPE Logo 

MEOS GEO
16–18 September 2025 | Exhibition World Bahrain

SPE Logo

MEOS GEO
16–18 September 2025 | Exhibition World Bahrain

Technical Programme

Subpage Hero

Loading

113 Well Completion and Production Monitoring III

Thursday, 18 September
Room 16
Technical Session
Session Chairpersons
Mahmoud Abd Elfattah - Packers Plus Energy Services
Hugo Osorio - Saudi Aramco PE&D
  • 1330-1350 227648
    Beyond Traditional Methods: Rfid Technology-based Solutions For Upper Completions
    S. Zaki, Weatherford Saudi Arabia; C. Munro, Weatherford UK Ltd.
  • 1350-1410 227375
    A Spoolable Fibre Gauge Icd Monitoring System, First Class Reservoir Surveillance At A Reduced Cost
    E. Murdoch, ARAMCO Overseas Co.; A.Y. Bukhamseen, Saudi Aramco; P. Asthana, Saudi Aramco PE&D; D.B. Patel, Halliburton Worldwide Ltd.
  • 1410-1430 227230
    Tackling Injection Conformance Issue In Gas Injection Well With Advanced Outflow Control Device Via Thru-tubing Deployment
    R. Marimuthu, M. Moradi, TAQA
  • 1430-1450 227506
    Enhancing Esp Efficiency And Reservoir Recovery Through Pdg-based Diagnostics: A Gulf Of Suez Case Study
    A. Soliman, Ganoub Elwadi egyptian petroleum holding company
  • Alternate 226932
    Innovative Temperature Log Analysis: A Field-scale Framework For An Advanced Well Integrity Profile
    H. Jassem, E. Aldandan, Saudi Aramco SAOO; N. Ikhsanov, Halliburton Saudi Arabia
  • Alternate 227342
    Optimizing Recovery: Retrofit Autonomous Inflow Control Device (AICD) Completions In Viscous Oil Horizontal And Vertical Wells - A Case Study
    M. Akbari, TAQA Well Completions; M. Knopczynski, M. Konopczynski, TAQA Well Completion
  • Alternate 227630
    Challenging Sand Retention Performance - Is The Conventional Sand Control Solution, The Only Viable Option?
    E. Reid, N. Wigg, TAQA Well Completions