113 Well Completion and Production Monitoring III
Thursday, 18 September
Room 16
Technical Session
Session Chairpersons
-
1330-1350 227648Beyond Traditional Methods: Rfid Technology-based Solutions For Upper Completions
-
1350-1410 227375A Spoolable Fibre Gauge Icd Monitoring System, First Class Reservoir Surveillance At A Reduced Cost
-
1410-1430 227230Tackling Injection Conformance Issue In Gas Injection Well With Advanced Outflow Control Device Via Thru-tubing Deployment
-
1430-1450 227506Enhancing Esp Efficiency And Reservoir Recovery Through Pdg-based Diagnostics: A Gulf Of Suez Case Study
-
Alternate 226932Innovative Temperature Log Analysis: A Field-scale Framework For An Advanced Well Integrity Profile
-
Alternate 227342Optimizing Recovery: Retrofit Autonomous Inflow Control Device (AICD) Completions In Viscous Oil Horizontal And Vertical Wells - A Case Study
-
Alternate 227630Challenging Sand Retention Performance - Is The Conventional Sand Control Solution, The Only Viable Option?