105 Well Completion and Production Monitoring II
Thursday, 18 September
Room 16
Technical Session
-
1030-1050 226852First Industrial High-power Laser Perforation Deployment In Openhole Application: New Millstone Achieved
-
1050-1110 227295Optimizations In Hydraulic Fracturing Operations, The Impact Of Using Dissolvable Frac Plugs In Saudi Arabia Fracturing Operations
-
1110-1130 227675Multifrequency Dielectric And Microscopic Analysis Of Water In Oil And Oil In Water Emulsions
-
1130-1150 226854Case Study: Controlling Injection In Horizontal Waterflood Wells Utilizing Tesla Flow Control Devices: Challenge, Application, And Lessons Learned
-
Alternate 227651World First ESP-ready ERD Smart Completion-Innovative Solutions To Reduce Future Well Interventions
-
Alternate 227131Qualification Of Spool Deployed Fiber Optic Gauge Array For Sand-face Monitoring