033 Production Optimisation II
Tuesday, 16 September
Room 16
Technical Session
Session Chairpersons
-
1530-1550 227428Enhanced Single-trip Intelligent Completion Installation With Esp And A Downhole Wet-mate
-
1550-1610 227602A Novel Downhole Flow Control Device Optimization System Integrating Crosswell EM For Enhancing Water Management
-
1610-1630 227309Enhanced Steam Plan Optimization For A Thermally Developed Heavy Oil Field In Kuwait
-
1630-1650 227008Achieving Effective Water Control In Low-viscosity Oil Reservoirs: A Case Study With Rcp Aicds In Offshore China
-
Alternate 226851Stabilization Of Crude Oil Emulsions By Flowback Fluid Solids Post Well Drilling And Workover Activities
-
Alternate 227682Feed-through Intervention Window Adds Versatility On Intelligent Completion Multilateral Wells
-
Alternate 227815Enhanced Filtercake Removal Technology For Improved Operational Flexibility
-
Alternate 226877Use Of A Digital Twin To Improve Wet-gas Flow Metering