033 Production Optimisation II
Tuesday, 16 September
Room 16
Technical Session
Session Chairpersons
-
1530-1550 227428Enhanced Single-Trip Intelligent Completion Installation with Esp and a Downhole Wet-mate
-
1550-1610 227602A Novel Downhole Flow Control Device Optimization System Integrating Crosswell EM for Enhancing Water Management
-
1610-1630 227309Enhanced Steam Plan Optimization for a Thermally Developed Heavy Oil Field in Kuwait
-
1630-1650 227008Achieving Effective Water Control in Low-Viscosity Oil Reservoirs: A Case Study with Rcp Aicds in Offshore China
-
Alternate 226851Stabilization of Crude Oilemulsions by Flowback Fluid Solids Post Well Drilling and Workover Activities
-
Alternate 227682Feed-Through Intervention Window Adds Versatility on Intelligent Completion Multilateral Wells
-
Alternate 227815Enhanced Filtercake Removal Technology for Improved Operational Flexibility