Skip to main content

SPE Logo 

MEOS GEO
16–18 September 2025 | Exhibition World Bahrain

SPE Logo

MEOS GEO
16–18 September 2025 | Exhibition World Bahrain

Technical Programme

Subpage Hero

Loading

092 Managed Pressure Drilling & Under-Balanced Drilling

Thursday, 18 September
Room 15
Technical Session
Session Chairpersons
Mahmoud Abughaban - Saudi Aramco PE&D
Sherif Emam - Weatherford Energy Services
  • 0830-0850 227567
    Performance Evaluation Of A Phased-array Flowmeter For Use In Non-newtonian Drilling Mud Flow
    A. Tebbani, Weatherford Houston; P. Northam, O. Unalmis, D. Rodriguez, Weatherford
  • 0850-0910 227701
    A New And Novel Managed Pressure Drilling System
    G. Hitchcock, Aramco Europe; A. Alshaarawi, Saudi Aramco PE&D
  • 0910-0930 227083
    Enhancing Well Integrity With Managed Pressure Drilling And Cementing In Challenging Zones With Significant Fluid Losses
    M. Aldhaif, Weatherford Saudi Arabia; m. Alqtari, Weatherford; Z. Toktabolat, Saudi Aramco D&WO
  • 0930-0950 227180
    Closing The Water Loop In Under Balance Coiled Tubing Operations
    A. Jabr, A. Al Ali, A. Al-Saegh, Saudi Aramco D&WO; R.A. Sanchez Nava, Schlumberger Saudi Arabia
  • Alternate 227520
    Addressing Complex Well Conditions: Integration Of Cementing Techniques To Achieve Zonal Isolation In Intermediate Liners
    M.H. Alhulaymi, E. Natera, R. Martanto, National Petroleum Services Co Saudi Arabia; J. Alqasab, Saudi Aramco PE&D; J. Pohl, Impact Fluid Solutions, LLC; D. Edgar, National Petroleum Services Co Saudi Arabia
  • Alternate 227361
    Ai-based Optimization Of Green Biodegradable Foaming Agent For Underbalanced Drilling: Enhancing Stability And Performance
    A. Gowida, S. Elkatatny, King Fahd University of Petroleum & Minerals
  • Alternate 226887
    Improved Methods For Determining Maximum Horizontal Stress From Borehole Breakout
    Y. Han, ARAMCO Services Company; T.M. Al-Mani, K. Khan, M. AlTammar, Saudi Aramco PE&D
  • Alternate 227817
    Advanced MPD Techniques For Ballooning Control: Effective Management Of Wellbore Breathing And Overbalance Optimization Allowed Successful Navigation Through The 12 In. Section To Achieve Target Depth - Case Study
    S.E. Krekov, Weatherford; M. Herhar, Weatherford Saudi Arabia
  • Alternate 227665
    Evaluation Of Lubricant Performance In Under-balanced Coiled Tubing Drilling: An Investigation Of Chemical Composition And Operational Efficiency
    A. Mishal, F. Aldossary, R. Pino, Saudi Aramco PE&D
  • Alternate 226926
    Selecting Wells For Underbalanced Coiled Tubing Drilling In Deep And Tight Reservoirs
    K. Xia, Saudi Aramco; Y. Han, ARAMCO Services Company; K. Saikia, W. Wang, Saudi Aramco Exploration