009 Artificial Lift Technologies
Tuesday, 16 September
Room 16
Technical Session
-
1130-1150 227367Optimizing Highly Deviated Wells in Egypt: Cost-effective Transition from High-power ESP to Reciprocating Rod Pumping with Continuous Rod
-
1150-1210 227300Development and Successful Field Trial of Novel Downhole Gas Handling Concept
-
1210-1230 227082Integrated Data Mining And Automation For Gas Lift Design Optimization
-
1230-1250 226843Highly Reliable Subsurface Compressor System Enables Increased Natural Gas Production And Recoverability
-
Alternate 227641Technological Breakthrough: How The Inverse Gas Lift System Redefines Well Services
-
Alternate 227762Physical Performance Tests of a Tandem Ultra-high-speed High-gas-volume-fraction Pump