Advancements in Cementing and Drilling/Completion Fluids
Tuesday, 27 May
Meeting Room 1
Technical Session
Session Chairpersons
-
1330-1400 225654Implementing A Novel Resin-infused Cementing Solution to Mitigate Annulus Pressure and Revitalize Production, Saving 60-days of Rig Time
-
1400-1430 225663Enhance Zonal Isolation Across High-permeable Formation by Implementing a Reactive Solution System
-
1430-1500 225650Addressing Complex Well Conditions: Integration of Cementing Techniques to Achieve Zonal Isolation in Intermediate Liners
-
Alternate 225657Implementing a Specialized Combined Cement-resin System to Mitigate Dump Flood Mechanism During Plug and Abandonment
-
Alternate 225670Operational Excellence by Cementing the Hcd-liner Less 9-5/8” Casing Design with Single Stage Cementation, Eliminating the Need for Multi-stage Tool and Dedicated Clean Out Trip in UAE Onshore