Emerging ESP Solutions
Tuesday, 20 October
Ballroom
Technical Session
-
1730-1750 234739Reducing Esp Failure Deferment Through A Dual‑Esp Completion Enabled By A Deep‑Set Trsssv
-
1750-1810 234735Operational Performance, Reliability, And Run Life Of Ultra-High-Speed ESP System Reinstalled Four Times Without Workshop Repair: Case Study.
-
1810-1830 234719Expanding The Application Range Of Esp Systems In High Free-gas Wells Through Advanced Gas-handling Solutions And Digital Intake Gas Prediction
-
Alternate 234755Successful Implementation Of A Downhole Module To Improve Safety And Optimize ESP PMM Operations: A Case Study From A Colombian Oil Field
-
Alternate 234736Successful Field Implementation Of Novel Gas-handling Stage
-
Alternate 234751Transient Multiphase Flow Modelling To Address The Gas Lock Challenge In Esp Well; From Capturing The True Physics To Sizing Completion Elements And Avoiding Expensive Workovers.
-
Alternate 234738Extending Esp Life In Sand-prone Reservoirs: Successful Implementation Of The Sand Mitigation System
-
Alternate 234756Redefining Esp Thresholds: Long-term Operation In High Dogleg Severity Wells

