Skip to main content

new logo

SPE Middle East Artificial Lift Conference and Exhibition
20–21 Oct 2026 | The Gulf Hotel Bahrain | Manama, Bahrain

Loading

Artificial Lift for Unconventional Wells

Wednesday, 21 October
Ballroom
Technical Session
  • 1130-1150 234726
    Tailored Slimline ESP Design For Unconventional Wells: A Departure From Conventional Esp Applications
    R. Guzman, M. Cowie, F. Alhosani, ADNOC Onshore
  • 1150-1210 234747
    Design Evolution Through Iterative Modifications Of Esp Seals For Sagd Wells.
    S. Pyron, J. Hill, B. Coates, M. Kana, J. Webster, L. Osorio Ojeda, Halliburton
  • 1210-1230 234763
    An Integrated Anti-vibration System For Artificial Lift Systems Using Progressing Cavity Pumping
    B. Gagnon, V. Hult, B. Putlinca, A. Dubey, Evolution Oil Tools Inc; R. Klein, Strathcona Resources Ltd.
  • Alternate 234750
    Desing Flexibility With Key Engineering Of Velocity String And Plunger Lift Managing Unconventional Gas Wells In UAE.
    R. Guzman, M. Cowie, F. Alhosani, ADNOC Onshore
  • Alternate 234737
    A Comparative Performance Study Of Conventional Mle And Persevere Connection Technologies For Esp Systems In High h₂S Middle East Fields
    M.C. Carvajal Vega, Alkhorayef Petroleum; A. Fardan, M.S. Funes, Saudi Aramco
  • Alternate 234743
    A Digital Twin Application In Artificial Lifted Wells; Optimization By Modeling While Measuring
    M.A. Alqahtani, A. Al Qahtani, Petroleum advanced research and technologies
  • Alternate 234742
    Optimizing Gas-lift Interventions Reducing Operational Downtime Through Dual-stage Advanced Kickover Tool Technology
    H. Gamal, M. Marzouk, Weatherford Saudi Arabia