Drilling and Completions: Next Generation Solutions for Complex Wells and Reservoir Productivity
Tuesday, 3 February
Gallery 4-A
Technical Session
-
1100-1120 231045Redefining Complex Well Interventions: Global First Water Shutoff in a 3-Legged Multilateral Well Using Real-time Hybrid Fiber Optic Coiled Tubing and Open Hole Straddle Packer, Unlocking Dormant Potential in North Kuwait Carbonate Reservoirs
-
1120-1140 231089Minimizing an Artificial Lift R&D Project Financial, Technical, Timeline, and Cost Risk with a Positive Impact on the Carbon Footprint
-
1140-1200 231041The Synergistic Application of High Precision Temperature and Spectral Noise Logging for Evaluating ICD Zonal Isolation Integrity: A Comparative Study with Spinner-based Techniques
-
1200-1220 230870State-of-the-art Combined Off-bottom Liner and Lower Completion Systems: Engineering Optimization and Operational Excellence
-
Alternate 230868Dual Train Hammer Squeeze Solution for Total Losses, Implementation & Outcomes
-
Alternate 230850A Seamless Execution Of Managed Pressure Drilling Controlling Drilling Hazards And Pore Pressure Uncertainty Related High-pressure High-temperature In Horizontal North Kuwait Jurassic Deep Wells
