Drilling and Completions: Completion and Efficiency
Thursday, 5 February
Gallery 4-A
Technical Session
Session Chairpersons
-
0900-0920 230999First Implementation of Zonal Integrity Recovery through a Regenerative Hydraulic Seal
-
0920-0940 230914Driving Recovery Efficiency in Offshore Fields through Completion Excellence
-
0940-1000 230991Technical Evaluation of 18.625 X 22 Casing While Drilling Introduction in Jurassic Wells Kuwait Fields
-
1000-1020 230942Unlocking High-temperature Drilling Performance in Remote Offshore: A Case Study of Novel Synthetic-based Mud in Anambas Offshore Exploration Well
-
Alternate 230920Restoration of Long Term Closed in “New Jurassic Gas Well” Long-Time Shut-in Due to a Sinking Wellhead Followed by the Rigless Activation Using CO2 Energized Acid Hydrofrac and Successful Realization of Production
-
Alternate 230996A Purpose-built Maintenance Facility and Protocols for Fracturing Operations Sustainability
-
Alternate 230988Fatigue Analysis and Failure Prediction Model of Drill String and Drill Pipe
-
Alternate 230985Innovative Application of Cement- Resin Blend Slurry to Cure Stubborn Leak Zone Saving Workover Rig Time
