Drilling and Completions: Breakthrough Technologies for Complex Wells
Tuesday, 3 February
Gallery 4-A
Technical Session
-
1330-1350 230851Overcoming a Challenging Casing Stuck Situation Through the Cutting and Recovery of a 1.2 Million-lbs 18-5/8 in. Casing String: A Breakthrough in KOC Deep Drilling Operations
-
1350-1410 230871Detecting Unconventional Bit Balling in Real-time Using A Bayesian Network and Mitigating Invisible Lost Time
-
1410-1430 231005Reduction of Water Production in a GasWell Through the First Field Application of a Thixotropic Organically Crosslinked Polymer System to Isolate a Water Producing Zone
-
1430-1450 230883Integrated Consolidation of Thousands Wells’ Deviation Surveys Helps North Kuwait to Eliminate Collision Risk and Unlocks New Deep Drilling Plans
-
Alternate 231072Completion Selection Workflow in North Kuwait Jurassic Gas Wells
-
Alternate 231017Experimental And Numerical Study On The Breathing Effect In Naturally Fractured Formations
-
Alternate 231077Reliable, Sustainable, and Innovative Workover (Cementing) Solution for Converting the Water Injector Well into Wag Injector
-
Alternate 230869Evaluation of Inductively Coupled Plasma Spectrometry (ICP) as a Test Method for Iron Levels in Acidizing Fluids
