Drilling and Completions: Breakthrough Technologies for Complex Wells
Tuesday, 3 February
Gallery 2
Technical Sessions
-
1330-1350 230851Overcoming The Challenging Casing Stuck Situation Through The Cutting And Recovery Of 1.2 Million Lbs 18-5/8” Casing - A Breakthrough In Koc Deep Drilling Operations
-
1350-1410 230871Detecting Bit Balling In Real-time Using A Bayesian Network And Mitigating Invisible Lost Time
-
1410-1430 231005Reduction Of Water Production In A Gas Well Through The First Field Application Of A Thixotropic Organically Crosslinked Polymer System To Isolate Water Producing Zone
-
1430-1450 230883Integrated Consolidation Of Thousands Wells’ Deviation Surveys Helps North Kuwait To Eliminate Collision Risk And Unlocks New Deep Drilling Plans
-
Alternate 231072Completion Selection Workflow In North Kuwait Jurassic Gas Wells
-
Alternate 231017Experimental And Numerical Study On The Breathing Effect In Naturally Fractured Formations
-
Alternate 231077Reliable, Sustainable, And Innovative Workover (Cementing) Solution For Converting The Water Injector Well Into Wag Injector
-
Alternate 230869Evaluation Of Inductively Coupled Plasma Spectroscopy (icp) As A Test Method For Iron Levels In Acidizing Fluids
