Future-Ready Wells: Innovative Strategies for Lifetime Integrity
Wednesday, 15 April
Room 3
Technical Session
-
1330-1400 232180Advancing Well Integrity With Slim Through-tubing, Dual-string Barrier Evaluation: First Middle East Deployment
-
1400-1430 232092Smart Annulus Management: The First Utilization Of "Back Pressure Manifold" In Indonesia
-
1430-1500 232024Balancing The Design Factors Triaxial And Uniaxial Of The Von Mises Ellipse With The API Limits For Full Scale Tubulars To Isotropic Materials - Part I - A Fundamental Review
-
Alternate 232144Restoring Well Integrity Through Novel Cement Placement In Communicating Annuli
-
Alternate 232154Field-proven Reactive Fluid Engineering In Kuwait: Integrated Pill-cement Techniques For Extreme Loss Zones
-
Alternate 232002Corrosion Evaluation Of Tungsten Alloy Electroplated Downhole Tubular Materials
-
Alternate 231994Localized Design And Validation Of Cement Systems For High-CO₂ Oilfields In The UAE
