09 Completion and Well Interventions 1
Tuesday, 21 April
Ibsen
Technical Session
-
1430-1455 231885Autonomous Inflow Control Devices In A Thin Oil Rim Development: A Post-production Review
-
1455-1520 231924Extreme Production Packer Qualification Testing In Unsupported Casing For The Akerbp Fenris Development
-
1520-1545 231913Laboratory Investigation Of Citric Acid As An Eco-friendly Chelating Agent For The Dispersion Of Iron Containing Settled Barite In Drilling Fluids: Insights From North Sea p&A Operations
-
Alternate 231920Using Perf, Wash, And Cement (PWC) For Casing Shoe Repair: A Case Study
-
Alternate 231903Development Of A Full-scale Benchmark Test Methodology For Evaluating Perf/Wash/Cement Annular Barrier Remediation Technologies
-
Alternate 231940Experimental Investigation Of Casing Integrity Under Thermal Expansion In A Geothermal Wellbore Setting
-
Alternate 231928When Rocks Clash: Rock Thermal Heterogeneities And Cement Failure In Co₂ Injection Wells, A FEM-CFD Study
