Well Integrity: Design and Intervention Strategies
Thursday, 25 June
Lausanne
Technical Session
-
1030-1050 233353First jet-based PWC operation in Germany commences plug & abandonment of a salt cavern
-
1050-1110 233183Detecting Transient Seepage in a High-Pressure Sour Gas Well Using High-resolution Acoustic Diagnostics -Caspian Field - A Case Study
-
1110-1130 233325Well Control Driven Completion Installation in Deepwater Multizone Intelligent Gas Wells: Case of the Sakarya Gas Field
-
1130-1150 233257Field Validation of an Engineered Lost Circulation Spacer: Lessons from 200 Cementing Operations in the Middle East
-
Alternate 233259Nonlinearly Constrained Joint Production Optimization of Inflow Control Valve Settings andBottomhole Pressures in Heterogeneous, Inter-bedded Water-bearing Sandstone-Shale Gas Reservoirs
-
Alternate 233306Field Application of Multi-sensor Passive Acoustic Logging for Efficient Well Integrity Diagnostics in Deep Vertical Gas Wells

