Skip to main content
Loading

Advances in Drilling and Completion Efficiency, Integrity, and Operational Reliability

Thursday, 25 June
Room 2
Technical Session
  • 1300-1320 233308
    Risk Managed Recovery Of A Lost Radioactive Source: Integrating Unconventional Fishing Methods With Safety Protocols
    A. Ahmed, B. Kodiah, A.O. Alshaigy, B. Banihammad, A.M. Bin Shamlan, ADNOC Onshore
  • 1320-1340 233364
    Innovative Bottom Hole Tool Design Yields Significant Drilling Efficiency Improvements Over Multiple-well Extended Reach Drilling Project On Alaska North Slope
    T.D. Jakabosky, Halliburton Co.; L. Smith, Alaskan Energy Resources Inc.
  • 1340-1400 233343
    One-part Lightweight Alkali-activated Slag Cement For Oil-well Cementing
    A. Ahmed, King Fahd University of Petroleum & Minerals
  • 1400-1420 233302
    Eliminating Debris-related Npt In Stacked-pack Completions Lessons From The Sakarya Field, Black Sea Turkey
    C.A. Domingos, E.E. Gecer, E. Akbas, A. Mazman, Turkish Petroleum Off-Shore Technology Center; V.A. Murtazin, Baker Hughes; F.D. Kaya, Turkish Petroleum Off-Shore Technology Center
  • Alternate 233304
    Early Identification Of Abnormal High-pressure Gas Influx During Managed Pressure Drilling In Ultra-deep Fractured Formations: A Case Study From The Shunbei Oilfield
    C. Weng, China University of Petroleum Beijing
  • Alternate 233342
    Application Of Comprehensive Geomechanical Diagnostics And Integrated Controls To Reduce Drilling NPT: A Turkey Field Case
    A. Ghadimipour, S. Perumalla, D. UPRETI, N. Salazar, M. Amin, Baker Hughes; H. Altinbay, M. Ozkaya, B.A. AYDIN, B. BULUT BILIM, E. TURKMENOGLU, A. Atasoy, B. Pehlivan, U. Günal, Turkish Petroleum
  • Alternate 233193
    A Synergistic Multi-modal Bridging System: Advancing Wellbore Strengthening Through Engineered Particle Architecture And Resilient Sealing
    A. Gadalla, A. Yami, A. Alomair, V. Wagle, Saudi Aramco PE&D
  • Alternate 233303
    Advanced Diagnostic And Remedial Zonal Isolation: Utilising Large-diameter Resettable Inflatable Packers To Rectify Integrity Failures In 24-inch Liner Completions.
    Z. Rzazade, N. Javadova, bp; A. Kindness, E. Patsyuchenko, P. Burrows, TAM International