Emerging Technologies in Production and Operations 2
Wednesday, 26 November
Khirdalan 1 & 2
Technical and Invited Presenter
-
1330-1400 230477Novel Well Abandonment: A Kazakhstan First - Setting The Scene For Future p&A Integrity Assurance
-
1400-1430 230475Electric Submersible Progressive Cavity Pump (ESPCP) With PMM: A Game-changer For Artificial Lift Wells
-
1430-1500 230480Field Application Of Demulsifier Injection For Slug Mitigation And Production Enhancement
-
Alternate 230479Optimizing Surface Processing: Cost Effective Practices To Sustain Production And Enhance Efficiency In Oil Operations
-
Alternate 230478Mitigating Electrical Submersible Pump Failures In Sand-producing Wells Using Screen Re-design And Nodal Analysis
-
AlternateAl-Noor Desalting Project, Simpler Design And Big Savings
-
Alternate 230476A Comprehensive Integrated Workflow For Successful Well Reactivation: From Diagnostic Assessment To Field Execution