Advances and Emerging Solutions in Drilling 1
Tuesday, 25 November
Sharg Zali 1
Technical Session
Session Chairpersons
-
1500-1530 230362Managed Pressure Drilling as an Enabler to Enhance HPHT Exploration Well Construction Efficiency. A Field Case from the Caspian Region
-
1530-1600 230358Multi- Dimensional Geomechanical Modelling For Wellbore Stability Analysis And Integrated Drilling Risk Management In Offshore Abu Dhabi
-
1600-1630 230351Improving Stability And Rheology Of Oil-based Drilling Fluids With A Novel Organoclay Additive For HPHT Applications
-
Alternate 230354Local Casing Expander: An Engineering Solution For Eliminating Sustained Casing Pressure And Enhancing Well Integrity On Karachaganak Field.

