49 Production Growth: Well Completion and Artificial Lift
Wednesday, 20 May
Grand Ballroom
Technical Session
-
1530-1550 232697Boosting Production Uptime: Optimizing ESP Well Performance with the Annular Vent Valve
-
1550-1610 232729Enhancing Thermal Recovery Capability of High-Temperature ESP in South Field, Oman
-
1610-1630 232696Determining Operating Envelope of an Ultra-High-Speed ESP Using Maximum Flow Relationships
-
1630-1650 232661Integrated Strategies for Optimizing Esp Performance Under High Gas Conditions
-
Alternate 232637Control Liquid Drainage from Closed-In Tubing to Maximize Intermittent (offshore) Gas Well Production