49 Production Growth: Well Completion and Artificial Lift
Wednesday, 20 May
Grand Ballroom
Technical Session
-
1530-1550 232697Boosting Production Uptime: Optimizing Esp Well Performance With The Annular Vent Valve
-
1550-1610 232734Enhancing ESP Reliability in Bahra Field Through Data Integration and Downhole Failure Analysis
-
1610-1630 232696Determining Operating Envelope Of An Ultra-high-speed Esp Using Maximum Flow Relationships
-
1630-1650 232661Integrated Strategies For Optimizing Esp Performance Under High Gas Conditions
-
Alternate 232637Control Liquid Drainage From Closed-in Tubing To Maximize Intermittent (offshore) Gas Well Production
-
Alternate 232632Revolutionizing Artificial Lift Systems Through Slim-hole Progressive Cavity Pump Deployment In 1000-well Implementation Of 3.5” Tubing Achieving Superior Solids Handling, Two-thirds Failure Reduction, And $16 Million In Savings, In Addition To 35,000 m³ Oil Deferment Avoidance And 75% Production Gain In Wells With 5.5” Casings
-
Alternate 232667First Esp Completion in a New Exploratory Well: Design Considerations, Operational Challenges, and Performance Outcomes
-
Alternate 232729Enhancing Thermal Recovery: Capability Of High-temperature Esps In South Field In Oman