Skip to main content
Loading

49 Production Growth: Well Completion and Artificial Lift

Wednesday, 20 May
Grand Ballroom
Technical Session
Session Chairpersons
Said AL Badi - Daleel Petroleum
Salim Al-Hakmani - Sultan Qaboos University
  • 1530-1550 232697
    Boosting Production Uptime: Optimizing Esp Well Performance With The Annular Vent Valve
    A.M. Al Mahrooqi, P. Ji, Petroleum Development Oman
  • 1550-1610 232734
    Enhancing ESP Reliability in Bahra Field Through Data Integration and Downhole Failure Analysis
    I. Fetoui, B. Al-Methen, B.A. Sumarto, Kuwait Oil Company
  • 1610-1630 232696
    Determining Operating Envelope Of An Ultra-high-speed Esp Using Maximum Flow Relationships
    C. Ejim, H. Banjar, Saudi Aramco PE&D; Y. Alexeev, Lex (Oil and Gas Equipment)
  • 1630-1650 232661
    Integrated Strategies For Optimizing Esp Performance Under High Gas Conditions
    A. Soliman, SLB Artificial Lift; W. Al Amri, A. Aljaradi, M.S. Babiker, SLB
  • Alternate 232637
    Control Liquid Drainage From Closed-in Tubing To Maximize Intermittent (offshore) Gas Well Production
    C.A. Veeken, Mature Gas Well Consultancy
  • Alternate 232632
    Revolutionizing Artificial Lift Systems Through Slim-hole Progressive Cavity Pump Deployment In 1000-well Implementation Of 3.5” Tubing Achieving Superior Solids Handling, Two-thirds Failure Reduction, And $16 Million In Savings, In Addition To 35,000 m³ Oil Deferment Avoidance And 75% Production Gain In Wells With 5.5” Casings
    B.M. Salem, Petroleum development in Oman; A.D. Al Zadjali, A.H. Al Harthy, S. Al Jabri, M.K. Al Subhi, A.H. Al, Petroleum Development Oman
  • Alternate 232667
    First Esp Completion in a New Exploratory Well: Design Considerations, Operational Challenges, and Performance Outcomes
    F.Z. Alotaibi, M. Al-Mutawa, M. Ayyavoo, T. Sadeq, Kuwait Oil Company
  • Alternate 232729
    Enhancing Thermal Recovery: Capability Of High-temperature Esps In South Field In Oman
    A.M. Al-Qassabi, Medco Oman LLC