Skip to main content
Loading

49 Production Growth: Well Completion and Artificial Lift

Wednesday, 20 May
Grand Ballroom
Technical Session
Session Chairpersons
Salim Al-Hakmani - Sultan Qaboos University
Said AL Badi - Daleel Petroleum
  • 1530-1550 232697
    Boosting Production Uptime: Optimizing ESP Well Performance with the Annular Vent Valve
    A.M. Al Mahrooqi, P. Ji, Petroleum Development Oman
  • 1550-1610 232734
    Enhancing ESP Reliability in Bahra Field Through Data Integration and Downhole Failure Analysis
    I. Fetoui, B. Al-Methen, B.A. Sumarto, Kuwait Oil Company
  • 1610-1630 232696
    Determining Operating Envelope of an Ultra-High-Speed ESP Using Maximum Flow Relationships
    C. Ejim, H. Banjar, Saudi Aramco PE&D; Y. Alexeev, Lex (Oil and Gas Equipment)
  • 1630-1650 232661
    Integrated Strategies for Optimizing Esp Performance Under High Gas Conditions
    A. Soliman, SLB Artificial Lift; W. Al Amri, A. Aljaradi, M.S. Babiker, SLB
  • Alternate 232637
    Control Liquid Drainage from Closed-In Tubing to Maximize Intermittent (offshore) Gas Well Production
    C.A. Veeken, Mature Gas Well Consultancy
  • Alternate 232632
    Revolutionizing Artificial Lift Systems Through Slim-hole Progressive Cavity Pump Deployment in 1000-well Implementation of 3.5” Tubing Achieving Superior Solids Handling, Two-thirds Failure Reduction, and $16 Million in Savings, in Addition to 35,000 m³ Oil Deferment Avoidance and 75% Production Gain in Wells with 5.5” Casings
    B.M. Salem, Petroleum development in Oman; A.H. Al Harthy, M. ALHINAI, S. Al Jabri, M.K. Al Subhi, A.H. Alamri, A.D. Al Zadjali, A. Al Lawati, M.S. Al-Sawafi, Petroleum Development Oman
  • Alternate 232729
    Enhancing Thermal Recovery Capability of High-Temperature ESP in South Field, Oman
    A.M. Al-Qassabi, F. AL BATTASHI, M. AL Kindi, H.A. Alsaadi, M. Mirza, Medco Oman LLC