01 Production Growth: Best Practices in Production Optimisation
Monday, 18 May
Meeting Room 8
Technical Session
Session Chairpersons
-
1400-1420 232341Zonal Flow Profiling and Water Source Identification Using Coiled Tubing Deployed PLT under Live ESP Conditions In highly deviated well: A Case Study From Kurdistan-Iraq
-
1420-1440 232342Managing Elongated Well Shut-Ins Under Force Majeure: High-Level Insights and Field Experiences to Maximize Recovery
-
1440-1500 232344Application of Heated Diesel in Hydrate Removal Across the Annulus of Production Riser and Coiled Tubing Gas Lift System in Deepwater Wells - A Journey to Success in Unlocking the Production Recovery
-
1500-1520 232334Integrated Workflow With Hydraulic Fracture Propagation and Production Simulation Technology For Multi-stage Length Optimization
-
Alternate 232330Tripling Rod Pump Run Life in A North Oman Well-a Using Electromagnetic Field Technology: A Sustainable Solution for Inorganic Scale Mitigation
-
Alternate 232337Leveraging Early Waterflood and Temporary Facilities to Derisk Full-field Development: The Field E EDF