01 Production Growth: Best Practices in Production Optimisation
Monday, 18 May
Meeting Room 8
Technical Session
Session Chairpersons
-
1400-1420 232341Zonal Flow Profiling And Water Source Identification Using Coiled Tubing Deployed Plt Under Live Esp Conditions In Highly Deviated Well: A Case Study From Kurdistan-Iraq
-
1420-1440 232342Managing Elongated Well Shut-ins Under Force Majeure: High-level Insights And Field Experiences To Maximize Recovery
-
1500-1520 232344Application Of Heated Diesel In Hydrate Removal Across The Annulus Of Production Riser And Coiled Tubing Gas Lift System In Deepwater Wells - A Journey To Success In Unlocking The Production Recovery
-
Alternate 232334Integrated Workflow With Hydraulic Fracture Propagation And Production Simulation Technology For Multi-stage Length Optimization
-
Alternate 232330Tripling Rod Pump Run Life In A North Oman Well-a Using Electromagnetic Field Technology: A Sustainable Solution For Inorganic Scale Mitigation
-
Alternate 232337Leveraging Early Waterflood And Temporary Facilities To Derisk Full-field Development: The Field E Edf
-
Alternate 232324Optimizing Oil Recovery With EP02 Linear Electric Submersible Pump: Advanced Artificial Lift For Demanding Well Conditions