Skip to main content
Loading

Technical Session 14: Innovative Techniques with Proven Effectiveness

Thursday, 6 August
Bougainville Room, Level 1
Technical Session
Session Chairpersons
Susheel Kumar Gupta - SLB
Robello Samuel - Halliburton
  • 1600-1620 233031
    A Cost-effective Development And World’S First Approach To Unlock Marginal Reserves In The Challenging Open Sea Mahakam Delta Through Proven Rigless Drilling Enhancement
    A. Dewanti, V. Sitompul, D. Hutabarat, A. Wibowo, D. Azalia, M. Maharanoe, C. Agriawan, M. Sobirin, PT Pertamina Hulu Mahakam
  • 1640-1700 233109
    Successful Deployment Of Mud-sealing Cement System For Zonal Isolation In Deepwater Extended Reach Drilling Well Indonesia: A Breakthrough In Deepwater Cementing Solutions
    M. Rossi, N. Poletti, S. Sinaga, B. Rachmat, G. Richardo, M. Azmi, H. Kurnia, ENI Indonesia; F. Parrozza, Eni SpA; P. Andhika, A. Afrianto, Y. Yusuf, C. Azwar, A. Simanjuntak, Dowell Schlumberger Indonesia
  • 1700-1720 233115
    Offshore First Application Of A Drivable Threaded And Coupled Connector For Large Bore Conductor
    A. Pratama, PT. Prima Energi Bawean; J. Wong, ThreadMan International Pte. Ltd.; S.S. Widita, A. Bimo, PT. Prima Energi Bawean
  • Alternate 233108
    Pioneering Application Of Autonomous Inflow Control Technology In Indonesia: Optimizing Oil And Managing Water In Horizontal Wells From An Offshore Low-quality Reservoir
    M. Stef Dondo, PT Pertamina Hulu Energi; P.M. Halomoan, R. Febriansyah, A. Priyatmono, Y. Ravizon, R. Jodhitya, W. Winiarti, N.R. Juwita, D. Hidayat, Pertamina Hulu Energi OSES; I.M. Ismarullizam, R. Arsyadanie, F. Hillis, F. Abdulhameed, InflowControl
  • Alternate 233063
    Establishing A New Pioneering Benchmark In Enhancing Safety And Efficiency: A Unique Integration Of Kinetic Shearing Bop In Gate Valve Drilling Operations
    M. Syafruddin, A. Ghanmi, F. Aulia, Saudi Aramco SAOO; A. Cuthbert, Boots & Coots, A Halliburton Service
  • Alternate 233100
    Field Application Of A Hybrid Point-the-bit Rotary Steerable System In Shallow Unconsolidated Reservoirs And Deep Hard-formation Sidetracking
    W. Jiang, Halliburton; Y. Gao, CNOOC shenzhen development department
  • Alternate 233033
    Structural Extension Of Fixed Offshore Platforms In Shallow Water By Partial Jacket For Major Brown-field Projects - Feasibility Check By Auto-design Technique
    P.K. Chatterjee, Dragon Oil Limited
  • Alternate 233087
    A Future Progressive Repair On Production Packer Leak With Slickline And Bismuth Isolation In Oil Producer Well In Malaysia
    T. Thillai Villallan, PETRONAS Carigali Sdn. Bhd.; S. Murugiah, Petronas Carigali Sdn Bhd; T. Setiawan, PETRONAS Carigali Sdn. Bhd.; M. Ali Jabris, Petronas Carigali Sdn Bhd; N. Foo Kwang Hui, PETRONAS Carigali Malaysia; C. SIM, S. Kasim, BiSN Technologies

Countdown